![background image](http://html1.mh-extra.com/html/mack/e7/e7_service-manual_3065456260.webp)
Page 7-20
200 SETUP AND ADJUSTMENTS
Timing Event Marker (TEM)
Installation
To install the TEM:
1. Thoroughly clean all oil residue from the
TEM and timing access window.
2. Completely back off the TEM jam nut
(toward the sensor pigtail).
3. Apply a 1/8- to 1/4-inch bead of Silastic
(MACK part No. 342SX32 or equivalent)
around the sensor threads at the jam nut.
Figure 7-33 — Silastic Application
4. Install the TEM sensor into the timing access
window and hand tighten until seated in the
timing window.
Figure 7-34 — Installing TEM Sensor
5. Tighten the jam nut, running it over the
Silastic.
6. Torque the jam nut to 22 lb-ft (30 N
폷
m) using
torque wrench J 24406 or equivalent.
Figure 7-35 — Torquing TEM Sensor Jam Nut
7. Wipe the excess Silastic with a dry cloth.
8. Reconnect all brackets, connections and
fuel lines.
Figure 7-36 — Pump Line Connections
9. Check all connections and clamps for
tightness. Check for leaks.
205205a
APPLY
1/8–1/4 INCH
BEAD OF
SILASTIC
1. Return from secondary
filter
2. Cylinder head overflow
line
3. Return to tank line
4. Capscrew
5. Return to secondary filter
6. Return from primary filter
7. Lubrication supply line
8. Capscrew
9. Capscrew
200363a
1
2
3
4
5
6
7
8
9
5-101.bk Page 20 Friday, March 17, 2006 11:05 AM
Summary of Contents for E7
Page 1: ...E7 ENGINE OVERHAUL AUGUST 1997 ENGINE 5 101...
Page 2: ...Page 0 front fr5 Page 0 Friday March 17 2006 11 04 AM...
Page 5: ...E7ENGINE OVERHAUL MARCH 2006 2 5M REP AUGUST 1997 10M MACK TRUCKS INC 1997 ENGINE 5 101...
Page 13: ...ABOUT THIS MANUAL Page ix ABOUT THIS MANUAL front fr5 Page ix Friday March 17 2006 11 04 AM...
Page 15: ...TABLE OF CONTENTS Page xi TABLE OF CONTENTS front fr5 Page xi Friday March 17 2006 11 04 AM...
Page 24: ...Page xx NOTES front fr5 Page xx Friday March 17 2006 11 04 AM...
Page 31: ...200 SPECIFICATIONS Page 2 1 SPECIFICATIONS 5 101 bk Page 1 Friday March 17 2006 11 05 AM...
Page 55: ...200 ENGINE REMOVAL Page 3 1 ENGINE REMOVAL 5 101 bk Page 1 Friday March 17 2006 11 05 AM...
Page 58: ...Page 3 4 NOTES 5 101 bk Page 4 Friday March 17 2006 11 05 AM...
Page 90: ...Page 4 32 NOTES 5 101 bk Page 32 Friday March 17 2006 11 05 AM...
Page 91: ...200 BENCH PROCEDURES Page 5 1 BENCH PROCEDURES 5 101 bk Page 1 Friday March 17 2006 11 05 AM...
Page 158: ...Page 5 68 NOTES 5 101 bk Page 68 Friday March 17 2006 11 05 AM...
Page 159: ...200 ENGINE ASSEMBLY Page 6 1 ENGINE ASSEMBLY 5 101 bk Page 1 Friday March 17 2006 11 05 AM...
Page 240: ...Page 6 82 NOTES 5 101 bk Page 82 Friday March 17 2006 11 05 AM...
Page 272: ...Page 8 10 NOTES 5 101 bk Page 10 Friday March 17 2006 11 05 AM...
Page 273: ...200 TROUBLESHOOTING Page 9 1 TROUBLESHOOTING 5 101 bk Page 1 Friday March 17 2006 11 05 AM...
Page 292: ...Page 9 20 NOTES 5 101 bk Page 20 Friday March 17 2006 11 05 AM...
Page 293: ...200 APPENDIX Page 10 1 APPENDIX 5 101 bk Page 1 Friday March 17 2006 11 05 AM...
Page 295: ...200 APPENDIX Page 10 3 E7 LUBRICATION SYSTEM 5 101 bk Page 3 Friday March 17 2006 11 05 AM...
Page 296: ...Page 10 4 200 APPENDIX E7 COOLING SYSTEM 5 101 bk Page 4 Friday March 17 2006 11 05 AM...
Page 297: ...INDEX Page 11 1 INDEX INDEX FR5 Page 1 Friday March 17 2006 11 04 AM...
Page 302: ...Page 11 6 NOTES INDEX FR5 Page 6 Friday March 17 2006 11 04 AM...
Page 303: ...E7 ENGINE OVERHAUL PRINTED IN U S A ENGINE 5 101 MACK TRUCKS INC 1997...