![background image](http://html1.mh-extra.com/html/mack/e7/e7_service-manual_3065456119.webp)
200 BENCH PROCEDURES
Page 5-29
Refer to Figure 5-31.
3. Place alignment fixture (1) over the cutter
base (2) to ensure proper positioning. With
fixture in place, tighten wing nuts on hold-
down capscrews. Remove alignment fixture.
Figure 5-31 — Alignment Fixture Placement
Refer to Figure 5-32.
The desired finished fire ring groove depth is
0.008 inch (0.203 mm).
4. Install cutter head J 37719 (1) on cutter base
(4).
a.
If fire ring groove (3) is visible, check
existing fire ring groove depth
dimension with depth gauge J 26948.
The difference between 0.008 inch and
the actual remaining depth of fire ring
groove is the amount to cut. Insert two
appropriate thickness gauges (2)
between cutter head (1) and cutter
base (4).
b.
If fire ring groove (3) is not visible,
insert two 0.008-inch thickness gauges
(2) between cutter head (1) and cutter
base (4).
5. Adjust cutter head J 37719 until it bottoms
out on deck surface of existing fire ring
groove. Tighten cutter head in this position
and remove the two thickness gauges.
Figure 5-32 — Setting Cutter Depth
1. Alignment fixture
2. Cutter base
200290a
1
2
1. Cutter head (J 37719)
2. Thickness gauges
3. Fire ring groove
4. Cutter base
200291a
1
2
3
4
5-101.bk Page 29 Friday, March 17, 2006 11:05 AM
Summary of Contents for E7
Page 1: ...E7 ENGINE OVERHAUL AUGUST 1997 ENGINE 5 101...
Page 2: ...Page 0 front fr5 Page 0 Friday March 17 2006 11 04 AM...
Page 5: ...E7ENGINE OVERHAUL MARCH 2006 2 5M REP AUGUST 1997 10M MACK TRUCKS INC 1997 ENGINE 5 101...
Page 13: ...ABOUT THIS MANUAL Page ix ABOUT THIS MANUAL front fr5 Page ix Friday March 17 2006 11 04 AM...
Page 15: ...TABLE OF CONTENTS Page xi TABLE OF CONTENTS front fr5 Page xi Friday March 17 2006 11 04 AM...
Page 24: ...Page xx NOTES front fr5 Page xx Friday March 17 2006 11 04 AM...
Page 31: ...200 SPECIFICATIONS Page 2 1 SPECIFICATIONS 5 101 bk Page 1 Friday March 17 2006 11 05 AM...
Page 55: ...200 ENGINE REMOVAL Page 3 1 ENGINE REMOVAL 5 101 bk Page 1 Friday March 17 2006 11 05 AM...
Page 58: ...Page 3 4 NOTES 5 101 bk Page 4 Friday March 17 2006 11 05 AM...
Page 90: ...Page 4 32 NOTES 5 101 bk Page 32 Friday March 17 2006 11 05 AM...
Page 91: ...200 BENCH PROCEDURES Page 5 1 BENCH PROCEDURES 5 101 bk Page 1 Friday March 17 2006 11 05 AM...
Page 158: ...Page 5 68 NOTES 5 101 bk Page 68 Friday March 17 2006 11 05 AM...
Page 159: ...200 ENGINE ASSEMBLY Page 6 1 ENGINE ASSEMBLY 5 101 bk Page 1 Friday March 17 2006 11 05 AM...
Page 240: ...Page 6 82 NOTES 5 101 bk Page 82 Friday March 17 2006 11 05 AM...
Page 272: ...Page 8 10 NOTES 5 101 bk Page 10 Friday March 17 2006 11 05 AM...
Page 273: ...200 TROUBLESHOOTING Page 9 1 TROUBLESHOOTING 5 101 bk Page 1 Friday March 17 2006 11 05 AM...
Page 292: ...Page 9 20 NOTES 5 101 bk Page 20 Friday March 17 2006 11 05 AM...
Page 293: ...200 APPENDIX Page 10 1 APPENDIX 5 101 bk Page 1 Friday March 17 2006 11 05 AM...
Page 295: ...200 APPENDIX Page 10 3 E7 LUBRICATION SYSTEM 5 101 bk Page 3 Friday March 17 2006 11 05 AM...
Page 296: ...Page 10 4 200 APPENDIX E7 COOLING SYSTEM 5 101 bk Page 4 Friday March 17 2006 11 05 AM...
Page 297: ...INDEX Page 11 1 INDEX INDEX FR5 Page 1 Friday March 17 2006 11 04 AM...
Page 302: ...Page 11 6 NOTES INDEX FR5 Page 6 Friday March 17 2006 11 04 AM...
Page 303: ...E7 ENGINE OVERHAUL PRINTED IN U S A ENGINE 5 101 MACK TRUCKS INC 1997...