Page 7-14
200 SETUP AND ADJUSTMENTS
3. Clean the J 37077 tool sensor probe points
with compressed air before using. This helps
prevent metallic contamination between the
sensor probe points.
Figure 7-16 — Cleaning Sensor Probe Points
4. Install fixed timing position sensor tool
J 37077. Make sure that tool is correctly
aligned with the locating groove in the fixed
timing port.
Figure 7-17 — Installing J 37077 Tool
5. Slowly turn the knurled surface clockwise to
lock the tool into place. Check to make sure
tool is seated by applying pressure to the
end of the tool and checking for any
movement. If movement is detected, remove
and reinstall the tool.
Figure 7-18 — Turning Knurled Surface Clockwise
6. Connect the fixed timing tool ground to the
engine and press power switch on.
Figure 7-19 — Grounding and Turning Tool On
200492a
200405a
J 37077
200406a
200407a
KENT
-MOO
RE
A
B
PO
WER
POSITION SE
NSOR
J 3
70
77
5-101.bk Page 14 Friday, March 17, 2006 11:05 AM
Summary of Contents for E7
Page 1: ...E7 ENGINE OVERHAUL AUGUST 1997 ENGINE 5 101...
Page 2: ...Page 0 front fr5 Page 0 Friday March 17 2006 11 04 AM...
Page 5: ...E7ENGINE OVERHAUL MARCH 2006 2 5M REP AUGUST 1997 10M MACK TRUCKS INC 1997 ENGINE 5 101...
Page 13: ...ABOUT THIS MANUAL Page ix ABOUT THIS MANUAL front fr5 Page ix Friday March 17 2006 11 04 AM...
Page 15: ...TABLE OF CONTENTS Page xi TABLE OF CONTENTS front fr5 Page xi Friday March 17 2006 11 04 AM...
Page 24: ...Page xx NOTES front fr5 Page xx Friday March 17 2006 11 04 AM...
Page 31: ...200 SPECIFICATIONS Page 2 1 SPECIFICATIONS 5 101 bk Page 1 Friday March 17 2006 11 05 AM...
Page 55: ...200 ENGINE REMOVAL Page 3 1 ENGINE REMOVAL 5 101 bk Page 1 Friday March 17 2006 11 05 AM...
Page 58: ...Page 3 4 NOTES 5 101 bk Page 4 Friday March 17 2006 11 05 AM...
Page 90: ...Page 4 32 NOTES 5 101 bk Page 32 Friday March 17 2006 11 05 AM...
Page 91: ...200 BENCH PROCEDURES Page 5 1 BENCH PROCEDURES 5 101 bk Page 1 Friday March 17 2006 11 05 AM...
Page 158: ...Page 5 68 NOTES 5 101 bk Page 68 Friday March 17 2006 11 05 AM...
Page 159: ...200 ENGINE ASSEMBLY Page 6 1 ENGINE ASSEMBLY 5 101 bk Page 1 Friday March 17 2006 11 05 AM...
Page 240: ...Page 6 82 NOTES 5 101 bk Page 82 Friday March 17 2006 11 05 AM...
Page 272: ...Page 8 10 NOTES 5 101 bk Page 10 Friday March 17 2006 11 05 AM...
Page 273: ...200 TROUBLESHOOTING Page 9 1 TROUBLESHOOTING 5 101 bk Page 1 Friday March 17 2006 11 05 AM...
Page 292: ...Page 9 20 NOTES 5 101 bk Page 20 Friday March 17 2006 11 05 AM...
Page 293: ...200 APPENDIX Page 10 1 APPENDIX 5 101 bk Page 1 Friday March 17 2006 11 05 AM...
Page 295: ...200 APPENDIX Page 10 3 E7 LUBRICATION SYSTEM 5 101 bk Page 3 Friday March 17 2006 11 05 AM...
Page 296: ...Page 10 4 200 APPENDIX E7 COOLING SYSTEM 5 101 bk Page 4 Friday March 17 2006 11 05 AM...
Page 297: ...INDEX Page 11 1 INDEX INDEX FR5 Page 1 Friday March 17 2006 11 04 AM...
Page 302: ...Page 11 6 NOTES INDEX FR5 Page 6 Friday March 17 2006 11 04 AM...
Page 303: ...E7 ENGINE OVERHAUL PRINTED IN U S A ENGINE 5 101 MACK TRUCKS INC 1997...