
M-9500-3.0.6-0 INTEGRA 9500-9505 Operations Manual – English
Approved
: Spike Reed
Effective:
15 Nov 2010
Supersedes:
28 Jan 2010
LVS®
CONFIDENTIAL
All contents copyright © LVS® 2010 Page 12 of 82
Basic Operations
The basic operational procedures for the INTEGRA 9500/9505 are listed below:
1. Turn on the system and wait 2 minutes for the lights to stabilize.
2. The system is setup with tabs located across the top of the screen. Each
tab is discussed in this guide.
Click the
Setup
tab and choose the desired Application standard (see
Figure below).
Note: When prompted for an Operator ID and Password, enter
admin for both the Operator ID and Password.
3. Click the
Calibration
tab and calibrate the system by placing either of the
Master Grade barcodes (located on the supplied Calibration Test Card)
into the center of the field of view, ensuring that the blue line passes
Choose an Application standard