![LTT SLC-M+ Series User Manual Download Page 20](http://html.mh-extra.com/html/ltt/slc-m-series/slc-m-series_user-manual_1945270020.webp)
Chapter 2 Installation
2.4 Hardware Installation
This section explains the installation steps with other hardware.
1. Check environment
Power supply
Power supply : 220 VAC
Environment
Temperature: 15
Relative humidity : 35 ~ 85 %
Other : Avoid to dust, dirt, oil, mist, strong vibration, or sudden temperature changes
2. Connect AC power cable
3. Connected
19
2.4 Hardware Installation
This section explains the installation steps with other hardware.
1. Check environment
Power supply
Power supply : 220 VAC, Single Phase
Environment
15 ~ 30
℃
,
Relative humidity : 35 ~ 85 %
Other : Avoid to dust, dirt, oil, mist, strong vibration, or sudden temperature changes
2. Connect AC power cable
onnected the pipes from blower to machine
This section explains the installation steps with other hardware.
Other : Avoid to dust, dirt, oil, mist, strong vibration, or sudden temperature changes
to machine.