Figure 107. Installing the riser-card to Riser 2
Step 2. Make sure the GPU power cables are connected to the system board.
Step 3. Make sure the air baffle is installed before installing the PCIe riser assemblies.
Figure 108. Installing the air baffle
Notes:
• If the heat sink is 1U, make sure the heat sink filler is installed to the air baffle.
116
ThinkEdge SE450 Maintenance Manual
Summary of Contents for 7D8T
Page 1: ...ThinkEdge SE450 Maintenance Manual Machine Types 7D8T ...
Page 8: ...vi ThinkEdge SE450 Maintenance Manual ...
Page 22: ...14 ThinkEdge SE450 Maintenance Manual ...
Page 45: ...Server components Figure 17 Server components Chapter 2 Server components 37 ...
Page 184: ...176 ThinkEdge SE450 Maintenance Manual ...
Page 206: ...198 ThinkEdge SE450 Maintenance Manual ...
Page 210: ...202 ThinkEdge SE450 Maintenance Manual ...
Page 217: ......
Page 218: ......