Table 26. Cable routing for the power backplane and the intrusion switch
From
To
1
Intrusion switch cable
Intrusion switch
Intrusion switch connector
2
Power backplane sideband cable
Power backplane
Power backplane sideband connector
Step 4. Power on the server. Make sure the power LED (green) is lit.
1
Power LED (green)
2
Power switch
Step 5. (If available) Hook the front end of the switch cap to the power backplane, and rotate the other end
to secure the cap; then apply the label to the power backplane.
Figure 118. Applying the switch cap and label
After this task is completed
Proceed to complete the parts replacement (see
“Complete the parts replacement” on page 174
).
Power supply replacement
See these topics to learn how to remove and install a power supply unit.
.
Hardware replacement procedures
123
Summary of Contents for 7D8T
Page 1: ...ThinkEdge SE450 Maintenance Manual Machine Types 7D8T ...
Page 8: ...vi ThinkEdge SE450 Maintenance Manual ...
Page 22: ...14 ThinkEdge SE450 Maintenance Manual ...
Page 45: ...Server components Figure 17 Server components Chapter 2 Server components 37 ...
Page 184: ...176 ThinkEdge SE450 Maintenance Manual ...
Page 206: ...198 ThinkEdge SE450 Maintenance Manual ...
Page 210: ...202 ThinkEdge SE450 Maintenance Manual ...
Page 217: ......
Page 218: ......