Figure 77. Disassembling the OCP adapter
3. Recycle the parts in compliance with local regulations.
Install the OCP Ethernet adapter
See this topic to learn how to install the OCP Ethernet adapter.
About this task
Note:
Before adding a new OCP Ethernet adapter to the server, make sure the present Riser 1 adapter
configuration is x16 or x16/x8, so that PCIe 4 and 5 slots on the system board are available for the OCP
cable.
Watch the procedure.
A video of this procedure is available from the following link:
•
https://www.youtube.com/playlist?list=PLYV5R7hVcs-DV_Ja2E7l6T-lwN_IrnJRk
Procedure
Step 1. If the OCP cable has not been installed, complete the following steps:
a. If necessary, remove the screw that secures the OCP filler; then, remove the filler.
.
Hardware replacement procedures
97
Summary of Contents for 7D8T
Page 1: ...ThinkEdge SE450 Maintenance Manual Machine Types 7D8T ...
Page 8: ...vi ThinkEdge SE450 Maintenance Manual ...
Page 22: ...14 ThinkEdge SE450 Maintenance Manual ...
Page 45: ...Server components Figure 17 Server components Chapter 2 Server components 37 ...
Page 184: ...176 ThinkEdge SE450 Maintenance Manual ...
Page 206: ...198 ThinkEdge SE450 Maintenance Manual ...
Page 210: ...202 ThinkEdge SE450 Maintenance Manual ...
Page 217: ......
Page 218: ......