Install the wall mount LED cable
See this topic to learn how to install the mount LED cable.
About this task
Watch the procedure.
A video of this procedure is available from the following link:
•
https://www.youtube.com/playlist?list=PLYV5R7hVcs-DV_Ja2E7l6T-lwN_IrnJRk
Procedure
Step 1. Secure the LED panel to the OCP cage with two screws; then, bend the cable twice as illustrated,
secure the cable with the cable clips, and connect the cable to the system board.
Figure 181. Installing the wall mount LED cable.
After this task is completed
Proceed to complete the parts replacement (see
“Complete the parts replacement” on page 174
).
Complete the parts replacement
Go through this checklist before completing parts replacement.
To complete parts replacement, go through the following list:
1. Ensure that all the removed components have been properly reinstalled and that no tools or loose
screws are left inside your server.
2. Properly route and secure the cables in the server. Refer to for each component that is installed.
3. If the top covers have been removed, reinstall it. See
“Install the top covers” on page 170
.
4. Reconnect external cables and power cords to the server.
174
ThinkEdge SE450 Maintenance Manual
Summary of Contents for 7D8T
Page 1: ...ThinkEdge SE450 Maintenance Manual Machine Types 7D8T ...
Page 8: ...vi ThinkEdge SE450 Maintenance Manual ...
Page 22: ...14 ThinkEdge SE450 Maintenance Manual ...
Page 45: ...Server components Figure 17 Server components Chapter 2 Server components 37 ...
Page 184: ...176 ThinkEdge SE450 Maintenance Manual ...
Page 206: ...198 ThinkEdge SE450 Maintenance Manual ...
Page 210: ...202 ThinkEdge SE450 Maintenance Manual ...
Page 217: ......
Page 218: ......