INSTALLATION
FLEXYII_WSHP-IOM-1307-E
- 10 -
FORKLIFT PROTECTIONS
NEVER LIFT THE UNIT WITHOUT FORKLIFT PROTECTIONS
REMOVE THE FORKLIFT PROTECTIONS
BEFORE INSTALLATION
PRELIMINARY CHECKS
Before installing the equipment, the following points MUST
be checked:
- Have the forklift protections been removed?
- Is there sufficient space for the equipment?
- Is the surface on which the equipment is to be
installed sufficiently solid to withstand its weight? A
detailed study of the frame must be made beforehand.
- Do the supply and return ductwork openings
excessively weaken the structure?
- Are there any obstructing items which could hinder the
operation of the equipment?
- Does the electrical power available correspond to the
equipment's electrical specifications?
- Is drainage provided for the condensate?
- Is there sufficient access for maintenance?
- Installation of the equipment could require different
lifting methods which may vary with each installation
(helicopter or crane). Have these been evaluated?
- Ensure that the unit is installed in accordance with the
installation instructions and local applicable codes.
- Check to ensure that the refrigerant lines do not rub
against the cabinet or against other refrigerant lines.
In general, make sure no obstacles (walls, trees or roof
ledges) are obstructing the duct connections or hindering
assembly and maintenance access.
INSTALLATION REQUIREMENTS
The surface on which the equipment is to be installed must
be clean and free of any obstacles which could hinder the
flow of air to the condensers:
-Avoid uneven surfaces
-Avoid installing two units side by side or close to each
other as this may restrict the airflow to the condensers.
Before installing a packaged Rooftop unit it is important to
understand:
- The direction of prevailing winds
-The direction and position of air flows.
-The external dimensions of the unit and the
dimensions of the supply and return air connections.
-The arrangement of the doors and the space required
to open them to access the various components.
CONNECTIONS
-
Ensure that all the pipe-work crossing walls or roofs
are secured, sealed and insulated.
-To avoid condensation problems, make sure that all
pipes are insulated according to the temperatures of
fluids and type of rooms.
NOTE: The AQUILUX protection sheets fitted to the finned
surfaces must be removed prior to start up.
Summary of Contents for ROOFTOP FLEXY FXK 55
Page 2: ......
Page 26: ...COMMISSIONNING FLEXYII_WSHP IOM 1307 E 24 STEP 3 Fitting STEP 4 Check SAME LEVEL 10 15 mm...
Page 36: ...COMMISSIONNING REPORT FLEXYII_WSHP IOM 1307 E 34 COMMENTS...
Page 50: ...VENTILATION AIRFLOW BALANCING FLEXYII_WSHP IOM 1307 E 48 AT18 18S...
Page 51: ...VENTILATION AIRFLOW BALANCING FLEXYII_WSHP IOM 1307 E 49 ADH355L...
Page 52: ...VENTILATION AIRFLOW BALANCING FLEXYII_WSHP IOM 1307 E 50 ADH450L...
Page 53: ...VENTILATION AIRFLOW BALANCING FLEXYII_WSHP IOM 1307 E 51 ADH500L...
Page 71: ...HEATING GAS BURNER FLEXYII_WSHP IOM 1307 E 69 60kW 120kW...
Page 72: ...HEATING GAS BURNER FLEXYII_WSHP IOM 1307 E 70 180kW 240kW...
Page 105: ......