COMMISSIONNING
FLEXYII_WSHP-IOM-1307-E
- 29 -
To check the wiring, please refer to Rooftop and Recovery Module electrical diagram.
Then connect the power cable from the module to the rooftop, and
the Modbus cable according to the bus connection wiring diagram
(it could be connected to the BE60 (A1) connector in electrical
rooftop panel or other options with bus communication).
Recovery module connection
Extraction roofcurb connection
Be careful:
Check connections and connect male connections to good
female one.
Roofcurb and recovery module connectors are the same.
Actuator roofcurb connection
Summary of Contents for ROOFTOP FLEXY FXK 55
Page 2: ......
Page 26: ...COMMISSIONNING FLEXYII_WSHP IOM 1307 E 24 STEP 3 Fitting STEP 4 Check SAME LEVEL 10 15 mm...
Page 36: ...COMMISSIONNING REPORT FLEXYII_WSHP IOM 1307 E 34 COMMENTS...
Page 50: ...VENTILATION AIRFLOW BALANCING FLEXYII_WSHP IOM 1307 E 48 AT18 18S...
Page 51: ...VENTILATION AIRFLOW BALANCING FLEXYII_WSHP IOM 1307 E 49 ADH355L...
Page 52: ...VENTILATION AIRFLOW BALANCING FLEXYII_WSHP IOM 1307 E 50 ADH450L...
Page 53: ...VENTILATION AIRFLOW BALANCING FLEXYII_WSHP IOM 1307 E 51 ADH500L...
Page 71: ...HEATING GAS BURNER FLEXYII_WSHP IOM 1307 E 69 60kW 120kW...
Page 72: ...HEATING GAS BURNER FLEXYII_WSHP IOM 1307 E 70 180kW 240kW...
Page 105: ......