COMMISSIONING
FLEXYII_WSHP-IOM-1307-E
- 40 -
STARTING THE UNIT
At this point the unit circuit breakers should be open
You will need a
DS60
maintenance controller.
Connecting the CLIMATIC displays (RJ12 connector on the
main board) :
Close the 24V Control Circuit breakers.
The CLIMATIC 60 starts after 30s
Reset the DAD photo (If fitted)
Check and adjust the control settings.
Refer to the control section in this manual to adjust the
different parameters.
POWERING THE UNIT
- Power up the unit by closing the isolator switch. - At this
point the blower should start unless the climatic does not
energise the contactor. In this particular case the blower
can be forced by bridging the port NO11 and C4 on
connector J15 on the Climatic. Once the fan is running,
check the rotation direction. Refer to the rotation arrow
located on the fan.
- The fans and compressors direction of rotation is checked
during the end of line test. They should therefore all turn in
either the right or wrong direction.
NOTE: A compressor rotating in the wrong direction will fail.
- If the fan turns in the wrong direction (the right direction is
shown on figure n° 11), disconnect the main power supply
to the machine at the building's mains switch, reverse two
phases and repeat the above procedure.
- Close all circuit breakers and power up the unit, remove
the bridge on connector J15 if fitted.
- If now only one of the components rotates in the wrong
direction, disconnect the power supply at the machine's
isolator switch (if fitted) and reverse two of the component’s
phases on the terminal within the electrical panel.
- Check the current drawn against the rated values, in
particular on the supply fan.
- If the readings on the fan are outside the specified limits,
this usually indicates excessive air flow which will affect the
life expectancy and the thermodynamic performances of the
unit. This will also increase the risks of water ingress into
the unit. Refer to the "Air Flow Balancing" section to correct
the problem.
At this point attach the manometers to the refrigerant circuit
Fig. 11
Summary of Contents for ROOFTOP FLEXY FXK 55
Page 2: ......
Page 26: ...COMMISSIONNING FLEXYII_WSHP IOM 1307 E 24 STEP 3 Fitting STEP 4 Check SAME LEVEL 10 15 mm...
Page 36: ...COMMISSIONNING REPORT FLEXYII_WSHP IOM 1307 E 34 COMMENTS...
Page 50: ...VENTILATION AIRFLOW BALANCING FLEXYII_WSHP IOM 1307 E 48 AT18 18S...
Page 51: ...VENTILATION AIRFLOW BALANCING FLEXYII_WSHP IOM 1307 E 49 ADH355L...
Page 52: ...VENTILATION AIRFLOW BALANCING FLEXYII_WSHP IOM 1307 E 50 ADH450L...
Page 53: ...VENTILATION AIRFLOW BALANCING FLEXYII_WSHP IOM 1307 E 51 ADH500L...
Page 71: ...HEATING GAS BURNER FLEXYII_WSHP IOM 1307 E 69 60kW 120kW...
Page 72: ...HEATING GAS BURNER FLEXYII_WSHP IOM 1307 E 70 180kW 240kW...
Page 105: ......