Service & Repair 105
3.
Secure chains or a sling to the upper and lower end
of the carrier panel. Attach the other end to a
suitable lifting device with a minimum lifting capacity of 1600
lbs
(726
kg). Adjust the hoist so
that it will support the panel once the roller assembly and pivot pin are removed, but not so tight
that it changes the
position of the carrier panel.
N
OTE
:
See Chapter 3
General Repair Practices
for more
detailed information about the correct use of
slings and
lifting chains.
4.
Once the carrier panel has been securely supported,
remove the roller assemblies from each side
of the tailgate through the open upper track holes. Remove the split image pin that retains the
roller pivot
and remove the roller shaft bushings.
OPERATIONAL STATUS
Truck Off
PTO Disengaged
CARRIER
PANEL
LEVER
Summary of Contents for 2R-III
Page 1: ...2R III MAINTENANCE MANUAL...
Page 2: ......
Page 3: ...2R III MAINTENANCE MANUAL...
Page 5: ......
Page 6: ......
Page 20: ...10 Introduction...
Page 42: ...32 Safety...
Page 58: ...48 Preventive Maintenance Figure 5 1 Hydraulic tank w return filter 1 2 3 4 5 6 7 8...
Page 66: ...56 Preventive Maintenance...
Page 102: ...92 Troubleshooting...