64 Check-Out
Checking Packer and Carrier Panel Shift (Knockout) Pressures
To check packer and carrier panel shift (knockout) pressures:
1.
Install a 0-3000
PSI
(0-207
BAR) pressure gauge at
the quick disconnect coupler on the front
control valve. Check the main relief pressure as described in
2.
Reduce main relief setting to below 1000
PSI
(69
BAR):
3.
Using a screwdriver remove the button plugs from
the end of the Main Control Valve packer and
carrier sections. Shift the packer and carrier linkage to the detented position and release, leaving
the valve
spools in the detented position.
OPERATIONAL STATUS
Truck Running
PTO Engaged
Speed Up On
Transmission Neutral
OPERATIONAL STATUS
Truck Off
PTO Disengaged
Summary of Contents for 2R-III
Page 1: ...2R III MAINTENANCE MANUAL...
Page 2: ......
Page 3: ...2R III MAINTENANCE MANUAL...
Page 5: ......
Page 6: ......
Page 20: ...10 Introduction...
Page 42: ...32 Safety...
Page 58: ...48 Preventive Maintenance Figure 5 1 Hydraulic tank w return filter 1 2 3 4 5 6 7 8...
Page 66: ...56 Preventive Maintenance...
Page 102: ...92 Troubleshooting...