112 Service & Repair
3.
Shift the control levers and cycle the panels as necessary
to align the upper and lower rollers with
the
track holes.
N
OTE
:
If the top roller is removed, first place a wedge between
the carrier panel and the partition
sheet to take the weight off the roller assemblies. If the bottom roller is removed, support the
carrier and packer panel assembly
before removing the roller.
OPERATIONAL STATUS
Truck Running
PTO Engaged
Speed Up Off
1
2
3
4
TRAC
K
HOLES
Summary of Contents for 2R-III
Page 1: ...2R III MAINTENANCE MANUAL...
Page 2: ......
Page 3: ...2R III MAINTENANCE MANUAL...
Page 5: ......
Page 6: ......
Page 20: ...10 Introduction...
Page 42: ...32 Safety...
Page 58: ...48 Preventive Maintenance Figure 5 1 Hydraulic tank w return filter 1 2 3 4 5 6 7 8...
Page 66: ...56 Preventive Maintenance...
Page 102: ...92 Troubleshooting...