
93
9
Appendix
Key to process sequence charts
Any condition
t1
Wait for gas safety interlock circuit air pressure moni-
tor min. scan
any
t2
Time for pressure build-up in the gas test line (only
with leakage test activated)
2 sec.
t3
Servo drive running time
30-60 sec.
t4
Re-circulation damper delay
0-t5
t5
Aeration time
30-999 sec. adjustable
t6
Transformer pre-energise time
3 sec.
t7
1st safety period
4 sec.
t8
Stabilisation period
3 sec.
t9’
2nd safety period
5 sec.
t9’’
2nd safety period
3 sec.
t9’’’
Safety period
3 sec.
t9’’’’
Safety period
4 sec.
t10
Operating phase
any
t11
Control mode
any
t12
Time for pressure relief in the gas test line
3 sec.
t13
Post-ventilation time
0-999 sec. adjustable
t14
Control elements at base load
t15
After-burning time
0-20 sec.*** adjustable
t16
Flame extinguishing check
5 sec.
t17
Leakage test, gas valve 2
30 sec.
t18
Triac selftest
Summary of Contents for ETAMATIC
Page 1: ...Manual ETAMATIC ETAMATIC S CE 0085 AU 0207 Sensors and Systems for Combustion Engineering...
Page 2: ......
Page 7: ...6 Table of Contents 9 27 Dimensions and weight 128 9 28 Declaration of Conformity 131...
Page 65: ...64 8 Control Mode 8 2 1 Leakage test flow chart Fig 8 4 Flow chart leakage test...
Page 90: ...89 9 Appendix 9 8 Process Sequence Charts Fig 9 3 Process sequence chart gas with pilot burner...
Page 91: ...90 9 Appendix Fig 9 4 Process sequence chart oil with pilot burner...
Page 92: ...91 9 Appendix Fig 9 5 Process sequence chart gas without pilot burner...
Page 93: ...92 9 Appendix Fig 9 6 Process sequence chart oil without pilot burner...
Page 99: ...98 9 Appendix Fig 9 8 ETAMATIC S wiring diagram with ignition flame monitoring...
Page 104: ...103 9 Appendix Fig 9 16 LSB connection ETAMATIC LT1 other LAMTEC devices...
Page 134: ...133 9 Appendix...
Page 135: ......