
49
6
O2-Control
No
FMS
ETA
Short Text
Description
Min
Max
Default
900
0
0
O2 TZ -
Dead time reduction for O
2
controlled system at full load
0
5
3
Reduces dead time at the burner’s high firing-rate. With
this parameter, you can adjust the dead time depending
on the firing-rate. Because of the higher gas speeds, the
dead time is reduced at the high firing-rate. The factory
setting is the reduction in the dead time of 3 seconds.
901
1
1
O2NeutrA
Correction value output when O
2
trim is deactivated
0
1000
400
Correction value is displayed at deactivated O
2
trim.
Fuel 1
(from 5.0 on):
and P 847 = 2,3 or 4:
0 = the last received value is permanently valid
1..65535 = Time-out in seconds after P 901 / P 902 is
active.
902
1
1
O2NeutrB
Correction value output when O
2
trim is deactivated.
0
1000
400
Correction value is displayed at deactivated O
2
trim.
Fuel 1
(from 5.0 on):
at P 7 = 2 (dec) and P 847 = 2, 3 or 4:
O
2
trim / CO controller slave / correction 1 via LSB
0 = the last received value is permanent valid
1..65535 = Time-out in seconds after P 901 / P 902 is
active.
917
1
1
LftmKorA
Air deficiency correction value fuel A
0
999
300
Air deficiency correction value for fuel 1
918
1
1
LftmKorB
Air deficiency correction for fuel B see P 917
0
999
300
Summary of Contents for ETAMATIC
Page 1: ...Manual ETAMATIC ETAMATIC S CE 0085 AU 0207 Sensors and Systems for Combustion Engineering...
Page 2: ......
Page 7: ...6 Table of Contents 9 27 Dimensions and weight 128 9 28 Declaration of Conformity 131...
Page 65: ...64 8 Control Mode 8 2 1 Leakage test flow chart Fig 8 4 Flow chart leakage test...
Page 90: ...89 9 Appendix 9 8 Process Sequence Charts Fig 9 3 Process sequence chart gas with pilot burner...
Page 91: ...90 9 Appendix Fig 9 4 Process sequence chart oil with pilot burner...
Page 92: ...91 9 Appendix Fig 9 5 Process sequence chart gas without pilot burner...
Page 93: ...92 9 Appendix Fig 9 6 Process sequence chart oil without pilot burner...
Page 99: ...98 9 Appendix Fig 9 8 ETAMATIC S wiring diagram with ignition flame monitoring...
Page 104: ...103 9 Appendix Fig 9 16 LSB connection ETAMATIC LT1 other LAMTEC devices...
Page 134: ...133 9 Appendix...
Page 135: ......