96
|
i
•
FeedGood
L
• Technical Guide
Memories
The Test verifies operation of the memories of the scale and of
the
T-DATA
Giga
device.
1.
To conduct the Test of all the memories, select the item
“ALL”;; to conduct the Test of a single memory select the type
of memory you want to check, then press
u
.
The display shows the message "Test in progress Wait...”
and at the end the message “Test executed correctly.”.
Note
: if you select the item “ALL” or the item "T-DATA Giga"
the display shows the message “Insert the T-DATA Giga.
Press OK to confirm or ESC to cancel.”. Press
OK
to execute
the Test.
Note
: do not interrupt execution of a Test in progress to avoid
damaging the scale.
ADC
The Test verifies operation of the A/D converter of the load cells
and the power supply reading.
Press
ESC
to exit the Test.
Note
: the display of unstable values indicates A/D converter
malfunctioning.
Digital Outputs
The Test verifies operation of the Alarm Out, of the outputs of the
“7-Power Outputs", “Relay Output”, “3-Relay Outputs” and
“4-Relay Outputs” options, enabling the individual outputs three
times. To conduct the Test, select the Test that you want to
execute, then press
u
. Press
ESC
to exit the Test.
Serial Lines
The Test verifies operation of the L-Link, CAN-Bus, COM A and
COM B Ports.
To conduct the Test, select the Port you want to verify, then
press
u
. The display shows the message "Test in progress.
Wait...” and at the end the message “Test executed correctly.”.
Note
: to execute the L-Link or CAN-Bus Port Test, you must have
connected a CAN device to the connector.
Note
: to execute the COM A or COM B Port Test, you must have
connected a RS232C Test Plug to the connector.
Summary of Contents for I Feed Good L
Page 1: ... i FeedGood L Weighing System Technical Guide ...
Page 2: ... ...
Page 13: ...i FeedGood L Technical Guide 11 Connection diagram base version ...
Page 15: ...i FeedGood L Technical Guide 13 Connection diagram with wireless Remote Terminal ...
Page 128: ... ...
Page 129: ... ...
Page 130: ... ...