![KW DAVID-613 Manual Download Page 27](http://html1.mh-extra.com/html/kw/david-613/david-613_manual_2013611027.webp)
KW Aufzugstechnik GmbH Inbetriebnahme DAVID-613
DAVID-D613-Inbetriebnahme-V124-EE 18.02.2022 Seite - 27 -
Assembly in the shaft:
According to standart the floor
computer strand is along-inter-
grated into the throughing. Our rec-
ommended standart throughing
90*60mm offers sufficiently place.
The lowest Stopp gets the remote
station with teh marking ST01 as-
signed. The floor computer should
be positioned approximately at
height of the door fighter.
The tablet cable 1 with a length of
2 meters is attached down to the
remote station.
The following functions are con-
tained:
1) 2xA landing call Up
2) 2xB landing call Down
3) 97A arrow diplay Up A1
4) 98A arrow display Down
A1
The tablet cable 2 with a length of
2 meters is attached up to the re-
mote station.
The following functions are con-
tained:
5) 2xC free allocable
6) 2xD free allocable
7) 97B arrow diplay Up A2
8) 98B arrow display Down
A2
Exactly the same as for the first
floor for all other floors will pro-
ceed.
The inlet cable for the remote sta-
tion strand isput in either lowest or
at the highest remote station, de-
pending upon situation of the ma-
chine-room.