![KW DAVID-613 Manual Download Page 14](http://html1.mh-extra.com/html/kw/david-613/david-613_manual_2013611014.webp)
KW Aufzugstechnik GmbH Inbetriebnahme DAVID-613
DAVID-D613-Inbetriebnahme-V124-EE 18.02.2022 Seite - 14 -
22B
Rope -Connection of the exteral Encoder-System Solution
The mountingset of the SOLUTION-Encodersystem has the fol-
lowing components:
- SOLUTION-Encoder with 10meter wire and plug for GOLIATH-
60 inverters.
- Metal-screwstick with exact Mxx screw.
- Holder, constructed as a Z-spring with 3 pieces of M3 screws.
The encoder is tested inside of the company. Please handle it very
carefully!
The holder avoids a motion of the encoder during the motor is
running.
.
The encoder should not mounted very hard with motor-casing.
The Z-spring helps to reach a flexible fixing with the motor-casing
Screw the treaded rod into bore of drive shaft. All mandrels have
been tested on synchronization. Avoid knocking shaft jour-nals!
For Thyssen winds W149 is a spezial manrel type W149 availa-
ble.
For Kasper external rotor are extended mandrels available.
Pull very carefully the encoder only with your hand, without any
tool, on the screwstick and fix the mounting.
After that please fix the metalholder with the casing of the ma-
chine. The encoder should not move with the machine, but the
fixing must not so hard that vibrations make damages inside of
the encoder!