KW Aufzugstechnik GmbH Inbetriebnahme DAVID-613
DAVID-D613-Inbetriebnahme-V124-EE 18.02.2022 Seite - 26 -
Assembly in the
shaft:
According to
standart the floor
computer strand si
along.integrated
into the troughing.
Our recommended
standard through-
ing 90 x 60 mm of-
fers sufficiently
place.
The lowest stop
gets the floor com-
puter with the
marking HS01 as-
signed. The remote
station should be
positioned approxi-
mately at the
height of the door
fighter.
The tablet cable for
the door side 1 with
a lenght of 2 me-
tres is attached
down to the remote
station.
If a floor with front
and back door
should likewise be
present in the floor
( door side 29 then
the tablet cable of
the 2 landing cap
panel is put above
to the remote sta-
tion.
Exactly the same
as for the first floor
for all other floors
will proceed.
The inlet cable for
the floor computer
strand is put in ei-
ther lowest or at
the highest floor
computer depend-
ing upon situation
of the machine-
room.