8
SHOCK ABSORBER, SWINGARM
50
201281-10
–
Clamp special tool in the vise.
Nitrogen filling tool (T170S1) (
p. 221)
–
Connect the special tool to the pressure regulator of the filling cylinder.
Filling gas - nitrogen
–
Adjust pressure regulator.
Guideline
Gas pressure
10 bar (145 psi)
–
Position the damper in the special tool.
The hexagonal part of the tap handle
A
engages in the hexagon socket of the
filling port screw.
–
Open filler tap
B
.
–
Fill the damper for at least 15 seconds.
Guideline
Gas pressure
10 bar (145 psi)
Info
Watch the pressure regulator dial.
Make sure that the damper is filled to the specified pressure.
–
Close the filling port screw using tap handle
A
.
–
Close spigot
B
and take the damper out of the special tool.
–
Tighten the filling port screw.
Guideline
Screw, reservoir filling port
M5
3 Nm (2.2 lbf ft)
–
Mount the rubber cap of the reservoir.
8.22
Installing the spring
201272-11
–
Clamp the damper in the vise using soft jaws.
–
Install retaining ring
1
and turn it down as far as possible.
The collar points to the adjusting ring.
–
Mount adjusting ring
2
and turn it down as far as possible.
The collar points to the spring.
–
Measure the overall spring length without a load.
–
Mount spring
3
.
Guideline
Spring rate
Soft
80 N/mm (457 lb/in)
Medium (standard)
85 N/mm (485 lb/in)
Hard
90 N/mm (514 lb/in)
–
Mount spring retainer
4
.
The open end is opposite the spring end.
201271-11
Alternative 1
–
Tension the spring to the prescribed amount by turning the adjusting ring.
Guideline
Spring preload
18 mm (0.71 in)
Hook wrench (T106S) (
p. 219)
Summary of Contents for 2011 690 SMC AUS
Page 1: ...REPAIR MANUAL 2011 690 SMC EU 690 SMC AUS UK Art no 3206122en ...
Page 2: ......
Page 33: ...7 HANDLEBAR CONTROLS 31 Tighten counter nut 1 ...
Page 69: ...11 FUEL TANK SEAT TRIM 67 Set the clock p 94 ...
Page 186: ...24 SERVICE SCHEDULE 184 One time interval Periodic interval ...
Page 187: ...185 ...