
Maintenance
110
Pos: 40.27.1 /Überschriften/Überschriften 2/U-Z/ZZinken tauschen (im Reparaturfall) @ 224\mod_1392293057621_78.docx @ 1816928 @ 2 @ 1
12.7
Replacing the tines (in case of repairs)
Pos: 40.27.2 /BA/Wartung/Schwader/Zinken / ZinkenarmeZinken tauschen (im Reparaturfall) mit Abweisblech Bild mit Tabelle @ 357\mod_1438754688087_78.docx @ 2656307 @ @ 1
8
10
7
6
4
9
7
4
3
II
I
I
II
1
SW9070092_2
2
3
5
6
5
Fig. 71
1 Tines
2
Tine
arm
3 Locknut
M12
4
Base
5
Tine holder
6
Disc 13 x 35 x 5
7
Detent edged washer SKB 12
8
Hexagon head screw M12 x 85 10.9
9
Hexagon head screw M12 x 100
10
Deflection sheet
Adhesive (high-strength) (order no. 938 627
0)
Pos: 40.27.3 /BA/Wartung/Schwader/Zinken / ZinkenarmeZinken tauschen (im Reparaturfall) mit/ ohne Abweisblech_Text @ 381\mod_1444051432268_78.docx @ 2750485 @ @ 1
•
To remove the broken tine, remove all tines in front of the broken tine.
•
Remove the broken tine.
Mounting new tine
•
Insert tine holder into tine. In doing so, make sure that the tine holder is positioned
according to the figure.
•
Slide tine with tine holder on tine arm.
•
Guide hexagon head screw with detent edged washer and disc from below through tine
holder and tine arm.
•
Apply adhesive (high-strength) on threading overhang of hexagon head screw.
•
Mount support, locknut and deflection sheet, if necessary.
•
Raise the tines at their end and tighten locknut with tightening torque = 95 Nm.
•
Proceed with all tines as described above.
Pos: 40.28 /Layout Module /---------------Seitenumbruch---------------- @ 0\mod_1196175311226_0.docx @ 4165 @ @ 1