148
451253/A
bow thruster noise ....................................... 23
cavitation......................................... 22–23, 28
electrical noise ...................................... 28, 30
flow noise ............................................ 21, 29
interference ............................................... 29
machinery noise.......................................... 28
propellers............................................. 23, 28
rattle noise ................................................ 29
self noise .................................................. 27
system ................................................ 13–14
transducer ........ 33–35, 37, 50, 52–53, 89, 94, 96–98
steel conduit .............................................. 39
requirements ............................................ 131
download from website .................................. 7
documents from website ................................. 7
1 pulse per second (1PPS) .............................. 82
remote control Processing Unit ........................ 85
RS-232 serial line cable................................. 80
RS-422 serial line cable................................. 81
TX transducer cable ..................................... 86
drawings.................................................... 110
dry docking
requirements ............................................ 131
E
electrical installation requirements
sonar room ................................................ 19
electrical noise
acoustic noise........................................ 28, 30
unpacking ............................................... 142
unpacking ............................................... 142
sonar room ................................................ 18
inspection ............................................... 137
lifting units and transportation boxes ............... 136
storage after unpacking ............................... 144
storage prior to installation ........................... 138
transportation ........................................... 135
unpacking ............................................... 140
unpacking a hydrophone .............................. 143
unpacking a mechanical unit ......................... 141
unpacking a sonar head ............................... 143
unpacking a transducer................................ 143
unpacking an electronic or electromechanical
unit ..................................................... 142
visual inspection ....................................... 137
external synchronization
connectors........................................ 76, 83–84
signal characteristics ........................... 76, 83–84
F
flow noise
acoustic noise........................................ 21, 29
protruding objects........................................ 22
G
approval by classification society.................... 132
cables and wiring ...................................... 130
compass deviation ..................................... 131
dry docking ............................................. 131
noise sources ........................................... 131
supply power ........................................... 130
uninterruptible power supply......................... 130
general safety rules ....................................... 146
grounding requirements
sonar room ................................................ 19
H
sonar room ................................................ 19
safety rules.............................................. 146
design, manufacture and mount the steel
conduit ................................................... 39
install the casings ........................................ 38
install the mounting frames............................. 42
lift units and transportation boxes ................... 136
transport Kongsberg Maritime equipment.......... 135
unpack a hydrophone.................................. 143
unpack a mechanical unit ............................. 141
unpack a sonar head ................................... 143
unpack a transducer.................................... 143
unpack an electronic or electromechanical
unit ..................................................... 142
unpack standard parts and units...................... 140
visual inspection of units and transportation
boxes after arrival .................................... 137
protruding objects........................................ 22
cable plan ................................................. 66
cable plan ................................................. 66
unpacking ............................................... 143
I
high voltage............................................. 146
transportation boxes ................................... 137
units...................................................... 137
principles.................................................. 33
requirements for installation personnel ............... 17
general requirements .................................. 132
casings..................................................... 38
mounting frames ......................................... 42
unpacking ............................................... 139
sonar room ................................................ 19
SBP 29 Installation Manual
Summary of Contents for SBP 29
Page 1: ...451253 A November 2019 Kongsberg Maritime AS SBP 29 Sub bottom profiler Installation Manual ...
Page 111: ...451253 A 111 Figure 12 862 216859 Drawing files ...
Page 112: ...112 451253 A Figure 13 307904 SBP 29 Installation Manual ...
Page 113: ...451253 A 113 Figure 14 862 218001 Drawing files ...
Page 114: ...114 451253 A Figure 15 871 219193 SBP 29 Installation Manual ...
Page 115: ...451253 A 115 Figure 16 871 219201 Drawing files ...
Page 116: ...116 451253 A Figure 17 388168 SBP 29 Installation Manual ...
Page 117: ...451253 A 117 Figure 18 871 219187 Drawing files ...
Page 118: ...118 451253 A Figure 19 821 219199 SBP 29 Installation Manual ...
Page 119: ...451253 A 119 Figure 20 388235 Drawing files ...
Page 120: ...120 451253 A Figure 21 871 219198 SBP 29 Installation Manual ...
Page 121: ...451253 A 121 Figure 22 388148 Drawing files ...
Page 122: ...122 451253 A Figure 23 315550 SBP 29 Installation Manual ...
Page 123: ...451253 A 123 Figure 24 430751 Drawing files ...
Page 124: ...124 451253 A Figure 25 871 212984 SBP 29 Installation Manual ...
Page 125: ...451253 A 125 Figure 26 407070 Drawing files ...
Page 126: ...126 451253 A Figure 27 448231_1A SBP 29 Installation Manual ...
Page 127: ...451253 A 127 Figure 28 427512 Drawing files ...
Page 128: ...128 451253 A Figure 29 435680 SBP 29 Installation Manual ...
Page 129: ...451253 A 129 Figure 30 444783 Drawing files ...
Page 151: ......
Page 152: ... 2019 Kongsberg Maritime ...