451253/A
147
Index
clock synchronisation ................................... 82
connection ................................................ 82
A
acoustic noise............................................. 26
ambient noise............................................. 30
bow thruster noise ....................................... 23
cavitation......................................... 22–23, 28
document downloads ..................................... 7
electrical noise ...................................... 28, 30
flow noise ............................................ 21, 29
interference ............................................... 29
machinery noise.......................................... 28
propellers............................................. 23, 28
purpose of this manual ................................... 7
rattle noise ................................................ 29
SBP 29 ............................................... 13–14
self noise .................................................. 27
target audience ............................................ 7
transducer ........ 33–35, 37, 50, 52–53, 89, 94, 96–98
tolerances ............................................... 130
sonar room ................................................ 18
about ....................................................... 26
ambient noise............................................. 30
bow thrusters ............................................. 23
cavitation......................................... 22–23, 28
contributing factors ...................................... 26
electrical noise ...................................... 28, 30
flow noise ............................................ 21, 29
general requirements .................................. 131
interference ............................................... 29
machinery noise.......................................... 28
propellers............................................. 23, 28
rattle noise ................................................ 29
self noise .................................................. 27
sources..................................................... 26
sonar room ................................................ 19
acoustic noise............................................. 30
general requirements .................................. 132
this manual................................................. 7
acoustic noise............................................. 28
B
purpose ..................................................... 7
target audience ............................................ 7
acoustic noise............................................. 23
transducer installation ................................... 23
brief description
transducer ........ 33–35, 37, 50, 52–53, 89, 94, 96–98
C
TX transducer ............................................ 86
designing, manufacturing and mounting the
steel conduit............................................. 39
minimum dimensions ................................... 39
1 pulse per second (1PPS) .............................. 82
remote control Processing Unit ........................ 85
RS-232 serial line ........................................ 80
RS-422 serial line ........................................ 81
Hydrographic Work Station ............................ 66
topside ..................................................... 66
general requirements .................................. 130
read this first .............................................. 55
installation ................................................ 38
cavitation
acoustic noise.................................... 22–23, 28
transducer ................................................. 23
approval ................................................. 132
1 pulse per second (1PPS) .............................. 82
connectors................................................. 74
signal characteristics .................................... 74
sonar room ................................................ 19
general requirements .................................. 131
responsibility ........................................... 131
requirements for installation personnel ............... 17
designing, manufacturing and mounting the
steel conduit............................................. 39
minimum dimensions ................................... 39
1 pulse per second (1PPS) .............................. 82
remote control Processing Unit ........................ 85
RS-232 serial cable ...................................... 80
RS-422 serial cable ...................................... 81
TX transducer cable ..................................... 86
acoustic noise............................................. 26
D
ambient noise............................................. 30
Index
Summary of Contents for SBP 29
Page 1: ...451253 A November 2019 Kongsberg Maritime AS SBP 29 Sub bottom profiler Installation Manual ...
Page 111: ...451253 A 111 Figure 12 862 216859 Drawing files ...
Page 112: ...112 451253 A Figure 13 307904 SBP 29 Installation Manual ...
Page 113: ...451253 A 113 Figure 14 862 218001 Drawing files ...
Page 114: ...114 451253 A Figure 15 871 219193 SBP 29 Installation Manual ...
Page 115: ...451253 A 115 Figure 16 871 219201 Drawing files ...
Page 116: ...116 451253 A Figure 17 388168 SBP 29 Installation Manual ...
Page 117: ...451253 A 117 Figure 18 871 219187 Drawing files ...
Page 118: ...118 451253 A Figure 19 821 219199 SBP 29 Installation Manual ...
Page 119: ...451253 A 119 Figure 20 388235 Drawing files ...
Page 120: ...120 451253 A Figure 21 871 219198 SBP 29 Installation Manual ...
Page 121: ...451253 A 121 Figure 22 388148 Drawing files ...
Page 122: ...122 451253 A Figure 23 315550 SBP 29 Installation Manual ...
Page 123: ...451253 A 123 Figure 24 430751 Drawing files ...
Page 124: ...124 451253 A Figure 25 871 212984 SBP 29 Installation Manual ...
Page 125: ...451253 A 125 Figure 26 407070 Drawing files ...
Page 126: ...126 451253 A Figure 27 448231_1A SBP 29 Installation Manual ...
Page 127: ...451253 A 127 Figure 28 427512 Drawing files ...
Page 128: ...128 451253 A Figure 29 435680 SBP 29 Installation Manual ...
Page 129: ...451253 A 129 Figure 30 444783 Drawing files ...
Page 151: ......
Page 152: ... 2019 Kongsberg Maritime ...