451253/A
143
Unpacking transducers
Prior to installation or use, transducers, sonar heads and hydrophones must be unpacked
from their transport boxes. It is important that this unpacking is done without inflicting
damage to the equipment.
Prerequisites
Observe the procedure for unpacking of standard parts and units.
Context
Transducers may be supplied mounted to a hull unit (if any), or packed separately. Sonar
heads and hydrophones are normally packed and shipped in separate boxes. Boxes are
identified by the order number and the serial number of the unit inside.
Note
Once a transducer, sonar head or hydrophone is unpacked, make sure that the body and
the cabling are not exposed to any mechanical stress. Protect the transducer face with a
padded cover plate to prevent damage.
Transducers may be heavy.
A SBP 29 must always be handled as a delicate instrument. Incorrect actions may
damage the SBP 29 beyond repair.
Observe these SBP 29 handling rules:
•
Do not
activate the SBP 29 when it is out of the water.
•
Do not
lift the SBP 29 transducer elements or Cable Connection Units by their cables.
•
Do not
step on the SBP 29 cables.
•
Do not
handle the SBP 29 roughly and avoid impacts.
•
Do not
expose the SBP 29 to direct sunlight or excessive heat.
•
Do not
use high-pressure water, sandblasting, metal tools or strong solvents to clean
the SBP 29 transducer face.
Procedure
1
Obtain the necessary lifting equipment, and make sure that the equipment is
certified for the weight.
2
Lift the transducer, sonar head or hydrophone out of the transportation box.
3
Place it in a stable position on the floor/work bench.
4
Inspect the unit for visual damage.
5
Make sure that the relevant protection is kept in place until the final stages of the
installation.
6
Collect and keep the relevant user manuals and/or documents provided with the unit.
Summary of Contents for SBP 29
Page 1: ...451253 A November 2019 Kongsberg Maritime AS SBP 29 Sub bottom profiler Installation Manual ...
Page 111: ...451253 A 111 Figure 12 862 216859 Drawing files ...
Page 112: ...112 451253 A Figure 13 307904 SBP 29 Installation Manual ...
Page 113: ...451253 A 113 Figure 14 862 218001 Drawing files ...
Page 114: ...114 451253 A Figure 15 871 219193 SBP 29 Installation Manual ...
Page 115: ...451253 A 115 Figure 16 871 219201 Drawing files ...
Page 116: ...116 451253 A Figure 17 388168 SBP 29 Installation Manual ...
Page 117: ...451253 A 117 Figure 18 871 219187 Drawing files ...
Page 118: ...118 451253 A Figure 19 821 219199 SBP 29 Installation Manual ...
Page 119: ...451253 A 119 Figure 20 388235 Drawing files ...
Page 120: ...120 451253 A Figure 21 871 219198 SBP 29 Installation Manual ...
Page 121: ...451253 A 121 Figure 22 388148 Drawing files ...
Page 122: ...122 451253 A Figure 23 315550 SBP 29 Installation Manual ...
Page 123: ...451253 A 123 Figure 24 430751 Drawing files ...
Page 124: ...124 451253 A Figure 25 871 212984 SBP 29 Installation Manual ...
Page 125: ...451253 A 125 Figure 26 407070 Drawing files ...
Page 126: ...126 451253 A Figure 27 448231_1A SBP 29 Installation Manual ...
Page 127: ...451253 A 127 Figure 28 427512 Drawing files ...
Page 128: ...128 451253 A Figure 29 435680 SBP 29 Installation Manual ...
Page 129: ...451253 A 129 Figure 30 444783 Drawing files ...
Page 151: ......
Page 152: ... 2019 Kongsberg Maritime ...