4
451253/A
Installation steps ..............................................................................................................37
Manufacturing and installing the casings ........................................................................38
Designing, manufacturing and mounting the steel conduits............................................39
Installing the TX mounting frames ..................................................................................42
Transducer elements ........................................................................................................44
Cable Connection Unit (CCU).........................................................................................46
INSTALLING THE SBP 29 TOPSIDE UNITS ............................. 47
Mains power ...........................................................................................................48
Location..................................................................................................................49
General information ...............................................................................................49
Logistics .................................................................................................................50
Procedures ..............................................................................................................50
Surface preservation ...............................................................................................52
Description .............................................................................................................52
Location..................................................................................................................53
Installation ..............................................................................................................53
CABLE LAYOUT AND INTERCONNECTIONS............................. 54
General requirements for cable installations....................................................................54
Shipyard and system cables .............................................................................................55
Cable plans.......................................................................................................................56
Cable plan overview ...............................................................................................57
List of SBP 29 cables .............................................................................................58
Cable plan SBP 29 Transceiver Unit......................................................................60
Cable plan EM 124 or EM 304 Processor Unit......................................................64
Cable plan EM 124 or EM 304 RX Unit................................................................65
Cable plan, Hydrographic Work Station ................................................................66
Clock synchronization (1PPS) .........................................................................................74
External synchronization .................................................................................................76
Cable drawings and specifications ...................................................................................79
RS-232 serial line connection using three wires ....................................................80
RS-422 serial line using two wires.........................................................................81
Clock synchronization (1PPS) using a coax cable .................................................82
EM 124 or EM 304 Synchronization .....................................................................83
SBP 29
Summary of Contents for SBP 29
Page 1: ...451253 A November 2019 Kongsberg Maritime AS SBP 29 Sub bottom profiler Installation Manual ...
Page 111: ...451253 A 111 Figure 12 862 216859 Drawing files ...
Page 112: ...112 451253 A Figure 13 307904 SBP 29 Installation Manual ...
Page 113: ...451253 A 113 Figure 14 862 218001 Drawing files ...
Page 114: ...114 451253 A Figure 15 871 219193 SBP 29 Installation Manual ...
Page 115: ...451253 A 115 Figure 16 871 219201 Drawing files ...
Page 116: ...116 451253 A Figure 17 388168 SBP 29 Installation Manual ...
Page 117: ...451253 A 117 Figure 18 871 219187 Drawing files ...
Page 118: ...118 451253 A Figure 19 821 219199 SBP 29 Installation Manual ...
Page 119: ...451253 A 119 Figure 20 388235 Drawing files ...
Page 120: ...120 451253 A Figure 21 871 219198 SBP 29 Installation Manual ...
Page 121: ...451253 A 121 Figure 22 388148 Drawing files ...
Page 122: ...122 451253 A Figure 23 315550 SBP 29 Installation Manual ...
Page 123: ...451253 A 123 Figure 24 430751 Drawing files ...
Page 124: ...124 451253 A Figure 25 871 212984 SBP 29 Installation Manual ...
Page 125: ...451253 A 125 Figure 26 407070 Drawing files ...
Page 126: ...126 451253 A Figure 27 448231_1A SBP 29 Installation Manual ...
Page 127: ...451253 A 127 Figure 28 427512 Drawing files ...
Page 128: ...128 451253 A Figure 29 435680 SBP 29 Installation Manual ...
Page 129: ...451253 A 129 Figure 30 444783 Drawing files ...
Page 151: ......
Page 152: ... 2019 Kongsberg Maritime ...