Signal transmission check - ringing
To verify correct signal transmission from the SBP transceiver to the TX transducer
elements a signal transmission check, often referred to as ringing, can be done. The
principle is to use a test transducer and a signal generator to induce a signal from each of
the transducer elements and verify the reception at the transceiver.
Note
The test transducer element may be any unit that by using a signal generator transmits
at the relevant frequency.
The SBP 29 TX elements can be used for this purpose. We suggest that you mount all
TX elements but one, use the last element for the signal check, and mount it when test
is completed.
How to verify the signal transmission
1
Position the test transducer element against one the transducer element to induce
a signal
2
Determine from illustration referred below, what channels (pins) at the transceiver
cable connector
3
Observe the received signal at the transceiver cable connector using a oscilloscope
4
Verify that the signal is received at the correct channels (pins) at the correct
transceiver cable connector
5
Repeat for each TX element
The signal path to verify is shown in the following illustration
.
SBP 29 Installation Manual
Summary of Contents for SBP 29
Page 1: ...451253 A November 2019 Kongsberg Maritime AS SBP 29 Sub bottom profiler Installation Manual ...
Page 111: ...451253 A 111 Figure 12 862 216859 Drawing files ...
Page 112: ...112 451253 A Figure 13 307904 SBP 29 Installation Manual ...
Page 113: ...451253 A 113 Figure 14 862 218001 Drawing files ...
Page 114: ...114 451253 A Figure 15 871 219193 SBP 29 Installation Manual ...
Page 115: ...451253 A 115 Figure 16 871 219201 Drawing files ...
Page 116: ...116 451253 A Figure 17 388168 SBP 29 Installation Manual ...
Page 117: ...451253 A 117 Figure 18 871 219187 Drawing files ...
Page 118: ...118 451253 A Figure 19 821 219199 SBP 29 Installation Manual ...
Page 119: ...451253 A 119 Figure 20 388235 Drawing files ...
Page 120: ...120 451253 A Figure 21 871 219198 SBP 29 Installation Manual ...
Page 121: ...451253 A 121 Figure 22 388148 Drawing files ...
Page 122: ...122 451253 A Figure 23 315550 SBP 29 Installation Manual ...
Page 123: ...451253 A 123 Figure 24 430751 Drawing files ...
Page 124: ...124 451253 A Figure 25 871 212984 SBP 29 Installation Manual ...
Page 125: ...451253 A 125 Figure 26 407070 Drawing files ...
Page 126: ...126 451253 A Figure 27 448231_1A SBP 29 Installation Manual ...
Page 127: ...451253 A 127 Figure 28 427512 Drawing files ...
Page 128: ...128 451253 A Figure 29 435680 SBP 29 Installation Manual ...
Page 129: ...451253 A 129 Figure 30 444783 Drawing files ...
Page 151: ......
Page 152: ... 2019 Kongsberg Maritime ...