142
451253/A
Unpacking electronic and electromechanical units
Prior to installation or use, electronic and electromechanical units must be unpacked
from their transport boxes. It is important that unpacking is done without inflicting
damage to the equipment.
Context
Electronic and electromechanical units are normally wrapped in clear antistatic plastic
bags.
Do not break the seal to open a printed circuit board, an electronic module or a unit
before it shall be used. If the unit is returned with a broken seal we will assume that it
has been used. You will then be billed accordingly.
Note
Beware of Electrostatic Discharge (ESD)!
When you handle electronic circuit boards and modules, you must beware of the dangers
of electrostatic discharge (ESD), both to yourself and to the equipment. In order to
ensure safe transport and storage, circuit boards and other electronic units will always
be wrapped in a clear plastic protective bag, and the bag will be sealed.
Procedure
1
Lift the unit, in its protective bag, out of the transport box.
Note
You must never use the cables to lift or carry a unit.
2
Place it in a stable position on the floor or on the workbench.
3
Inspect the unit for damage.
a
If a unit has been damaged, prepare an inspection report stating the condition
of the unit and actions taken.
b
Describe the damage, and collect photographic evidence if possible. Return
the inspection report to Kongsberg Maritime as soon as possible.
4
Assuming all is well, open the bag and remove the unit.
5
Take out and keep the documentation.
You will need the documentation if the item shall be returned to us.
6
If applicable, open the unit and check inside.
7
Remove any packing and desiccant material that may be found inside the shipping
container or bag.
8
Collect and keep the relevant user manuals and/or installation documents provided
with the unit.
SBP 29 Installation Manual
Summary of Contents for SBP 29
Page 1: ...451253 A November 2019 Kongsberg Maritime AS SBP 29 Sub bottom profiler Installation Manual ...
Page 111: ...451253 A 111 Figure 12 862 216859 Drawing files ...
Page 112: ...112 451253 A Figure 13 307904 SBP 29 Installation Manual ...
Page 113: ...451253 A 113 Figure 14 862 218001 Drawing files ...
Page 114: ...114 451253 A Figure 15 871 219193 SBP 29 Installation Manual ...
Page 115: ...451253 A 115 Figure 16 871 219201 Drawing files ...
Page 116: ...116 451253 A Figure 17 388168 SBP 29 Installation Manual ...
Page 117: ...451253 A 117 Figure 18 871 219187 Drawing files ...
Page 118: ...118 451253 A Figure 19 821 219199 SBP 29 Installation Manual ...
Page 119: ...451253 A 119 Figure 20 388235 Drawing files ...
Page 120: ...120 451253 A Figure 21 871 219198 SBP 29 Installation Manual ...
Page 121: ...451253 A 121 Figure 22 388148 Drawing files ...
Page 122: ...122 451253 A Figure 23 315550 SBP 29 Installation Manual ...
Page 123: ...451253 A 123 Figure 24 430751 Drawing files ...
Page 124: ...124 451253 A Figure 25 871 212984 SBP 29 Installation Manual ...
Page 125: ...451253 A 125 Figure 26 407070 Drawing files ...
Page 126: ...126 451253 A Figure 27 448231_1A SBP 29 Installation Manual ...
Page 127: ...451253 A 127 Figure 28 427512 Drawing files ...
Page 128: ...128 451253 A Figure 29 435680 SBP 29 Installation Manual ...
Page 129: ...451253 A 129 Figure 30 444783 Drawing files ...
Page 151: ......
Page 152: ... 2019 Kongsberg Maritime ...