102
451253/A
Visual inspection of units
Scope
WARNING
These checks must be completed before any power is switched onto the system.
After the physical installation has been carried out, all the system units must be visually
checked to ensure that the SBP 29units have been installed correctly. You must ensure
that the units have been mounted in the correct locations, correctly orientated (e.g. the
right way up) and are correctly secured.
Operator Unit
Perform a close visual inspection of the unit according to the following procedure
1
Check that the unit is installed properly, secured, and that it is suitably orientated to
enable easy operation.
2
Check that the unit is not damaged.
3
Make sure that appropriate slack has been applied to the cables.
4
Check that the air vents are not blocked.
5
Check the immediate environment around the unit. The operator should have easy
access to a communication system, and it must be possible to dim and/or switch
off the deckhead lights.
6
Checked (date/sign):__________________________
Transceiver Unit
Perform a close visual inspection of the SBP 29 Transceiver Unit cabinet.
1
Check that the unit is installed in the correct location, and is suitably orientated to
enable easy maintenance.
2
Check that the proper mounting bolts have been used, and that proper torque has
been applied.
3
Check that the unit is not damaged.
4
Make sure that you have access to the internal part of the cabinet and that
appropriate slack has been applied to the cables.
5
Check that the air vents are not blocked.
6
Check that the sonar room is equipped with proper light for maintenance work.
SBP 29 Installation Manual
Summary of Contents for SBP 29
Page 1: ...451253 A November 2019 Kongsberg Maritime AS SBP 29 Sub bottom profiler Installation Manual ...
Page 111: ...451253 A 111 Figure 12 862 216859 Drawing files ...
Page 112: ...112 451253 A Figure 13 307904 SBP 29 Installation Manual ...
Page 113: ...451253 A 113 Figure 14 862 218001 Drawing files ...
Page 114: ...114 451253 A Figure 15 871 219193 SBP 29 Installation Manual ...
Page 115: ...451253 A 115 Figure 16 871 219201 Drawing files ...
Page 116: ...116 451253 A Figure 17 388168 SBP 29 Installation Manual ...
Page 117: ...451253 A 117 Figure 18 871 219187 Drawing files ...
Page 118: ...118 451253 A Figure 19 821 219199 SBP 29 Installation Manual ...
Page 119: ...451253 A 119 Figure 20 388235 Drawing files ...
Page 120: ...120 451253 A Figure 21 871 219198 SBP 29 Installation Manual ...
Page 121: ...451253 A 121 Figure 22 388148 Drawing files ...
Page 122: ...122 451253 A Figure 23 315550 SBP 29 Installation Manual ...
Page 123: ...451253 A 123 Figure 24 430751 Drawing files ...
Page 124: ...124 451253 A Figure 25 871 212984 SBP 29 Installation Manual ...
Page 125: ...451253 A 125 Figure 26 407070 Drawing files ...
Page 126: ...126 451253 A Figure 27 448231_1A SBP 29 Installation Manual ...
Page 127: ...451253 A 127 Figure 28 427512 Drawing files ...
Page 128: ...128 451253 A Figure 29 435680 SBP 29 Installation Manual ...
Page 129: ...451253 A 129 Figure 30 444783 Drawing files ...
Page 151: ......
Page 152: ... 2019 Kongsberg Maritime ...