451253/A
137
Note
Due to the nature of Kongsberg Maritime’s products, and the extensive use of
delicate electronic parts, all units and boxes must be regarded and handled as
fragile equipment.
Inspection of units and transportation boxes
after arrival
A visual inspection must be done immediately after the box(es) have arrived at their
destination.
Prerequisites
If you suspect that the equipment has been damaged during the transport, request that a
representative of the carrier is present during the inspection.
Procedure
1
Check all boxes (wooden or cardboard boxes, plastic bags and/or pallets) for
physical damage.
Look for signs of dropping, immersion in water or other mishandling.
2
If external damage is detected, open the box to check its contents.
Request that a representative of the carrier to be present while the box is opened, so
any transportation damage can be identified and documented.
3
If a unit has been damaged, prepare an inspection report stating the condition of the
unit and actions taken.
Describe the damage, and collect photographic evidence if possible. Return the
inspection report to Kongsberg Maritime as soon as possible.
4
If units are not damaged, check the humidity absorbing material.
If required, dry or replace the bags, then re-pack the unit(s) according to the packing
instructions.
Summary of Contents for SBP 29
Page 1: ...451253 A November 2019 Kongsberg Maritime AS SBP 29 Sub bottom profiler Installation Manual ...
Page 111: ...451253 A 111 Figure 12 862 216859 Drawing files ...
Page 112: ...112 451253 A Figure 13 307904 SBP 29 Installation Manual ...
Page 113: ...451253 A 113 Figure 14 862 218001 Drawing files ...
Page 114: ...114 451253 A Figure 15 871 219193 SBP 29 Installation Manual ...
Page 115: ...451253 A 115 Figure 16 871 219201 Drawing files ...
Page 116: ...116 451253 A Figure 17 388168 SBP 29 Installation Manual ...
Page 117: ...451253 A 117 Figure 18 871 219187 Drawing files ...
Page 118: ...118 451253 A Figure 19 821 219199 SBP 29 Installation Manual ...
Page 119: ...451253 A 119 Figure 20 388235 Drawing files ...
Page 120: ...120 451253 A Figure 21 871 219198 SBP 29 Installation Manual ...
Page 121: ...451253 A 121 Figure 22 388148 Drawing files ...
Page 122: ...122 451253 A Figure 23 315550 SBP 29 Installation Manual ...
Page 123: ...451253 A 123 Figure 24 430751 Drawing files ...
Page 124: ...124 451253 A Figure 25 871 212984 SBP 29 Installation Manual ...
Page 125: ...451253 A 125 Figure 26 407070 Drawing files ...
Page 126: ...126 451253 A Figure 27 448231_1A SBP 29 Installation Manual ...
Page 127: ...451253 A 127 Figure 28 427512 Drawing files ...
Page 128: ...128 451253 A Figure 29 435680 SBP 29 Installation Manual ...
Page 129: ...451253 A 129 Figure 30 444783 Drawing files ...
Page 151: ......
Page 152: ... 2019 Kongsberg Maritime ...