451253/A
39
Procedure
1
Manufacture the casings according the production drawings.
Alter the drawings and the design as required to fit the vessel and the chosen
installation principle.
2
Install the casings under the hull in either the blister, the gondola or into the hull.
Designing, manufacturing and mounting the
steel conduits
Steel conduits are used to protect the SBP 29 cables. They should be filled with water
up to the waterline.
Prerequisites
You must be equipped with a standard set of tools. This tool set must comprise the
normal tools for mechanical tasks. This includes different screwdriver types, pliers,
adjustable spanners, etc. Each tool must be provided in various sizes. We recommend
that all tools are demagnetized to protect your equipment. The following specific tools
and items are required for this task:
• All relevant vessel and SBP 29 drawings must be available.
• All relevant work instructions, procedures and standards must be available.
• All relevant drawings have been approved by the classification society.
• The physical location of the SBP 29 has been determined.
• The installation method has been determined.
• The installation angles of the SBP 29 have been defined.
• All relevant personnel (naval architects, designers, skilled shipyard workers) and
tools must be available.
Observe the relevant rules and regulations related to welding. The quality of the welding
is critical to the safety of the vessel. Welding must only be done by a certified welder.
The final installation welds must be approved by the vessel’s national registry, the
corresponding maritime authority and/or classification society.
Context
The transducer cables connect through the vessel’s hull using steel conduits. The
conduits are welded to the hull. The top of each conduit must be closed and sealed to
preserve the watertightness. This can be done with a "Bratberger", "Roxtec" or a similar
sort of sealing device.
The installation of the conduits must be properly planned. All plans and drawings must
be approved by the classification authority. This is always the yard’s responsibility.
Summary of Contents for SBP 29
Page 1: ...451253 A November 2019 Kongsberg Maritime AS SBP 29 Sub bottom profiler Installation Manual ...
Page 111: ...451253 A 111 Figure 12 862 216859 Drawing files ...
Page 112: ...112 451253 A Figure 13 307904 SBP 29 Installation Manual ...
Page 113: ...451253 A 113 Figure 14 862 218001 Drawing files ...
Page 114: ...114 451253 A Figure 15 871 219193 SBP 29 Installation Manual ...
Page 115: ...451253 A 115 Figure 16 871 219201 Drawing files ...
Page 116: ...116 451253 A Figure 17 388168 SBP 29 Installation Manual ...
Page 117: ...451253 A 117 Figure 18 871 219187 Drawing files ...
Page 118: ...118 451253 A Figure 19 821 219199 SBP 29 Installation Manual ...
Page 119: ...451253 A 119 Figure 20 388235 Drawing files ...
Page 120: ...120 451253 A Figure 21 871 219198 SBP 29 Installation Manual ...
Page 121: ...451253 A 121 Figure 22 388148 Drawing files ...
Page 122: ...122 451253 A Figure 23 315550 SBP 29 Installation Manual ...
Page 123: ...451253 A 123 Figure 24 430751 Drawing files ...
Page 124: ...124 451253 A Figure 25 871 212984 SBP 29 Installation Manual ...
Page 125: ...451253 A 125 Figure 26 407070 Drawing files ...
Page 126: ...126 451253 A Figure 27 448231_1A SBP 29 Installation Manual ...
Page 127: ...451253 A 127 Figure 28 427512 Drawing files ...
Page 128: ...128 451253 A Figure 29 435680 SBP 29 Installation Manual ...
Page 129: ...451253 A 129 Figure 30 444783 Drawing files ...
Page 151: ......
Page 152: ... 2019 Kongsberg Maritime ...