130
451253/A
Installation requirements
Supply power requirements
Observe the general requirements related to the supply power.
The supply voltage to the SBP 29 must be kept within ±10% of the installation’s nominal
voltage.
Maximum transient voltage variations on the main switchboard’s bus-bars are not to
exceed -15% to +20% of the nominal voltage (except under fault conditions).
Uninterruptible power supply (UPS)
requirements
Observe these requirements related to the Uninterruptible Power Supply (UPS).
The Uninterruptible Power Supply (UPS) must have the capacity to independently
maintain power to the SBP 29 for a minimum of 10 minutes. This ensures that the
SBP 29 can be turned off in a controlled manner in the event of a power failure.
Cables and wiring requirements
Correct wiring is crucial for the operational performance of the SBP 29.
All cables running between system cabinets located in different rooms and/or on different
decks must be supported and protected along their entire lengths using conduits and/or
cable trays. Note that the cables must not be installed in the vicinity of high-power
supplies and cables, antenna cables or other possible sources of interference.
All SBP 29 cables must be run in steel conduits.
For more detailed information about cables and wiring, refer to the basic cable
requirements.
SBP 29 Installation Manual
Summary of Contents for SBP 29
Page 1: ...451253 A November 2019 Kongsberg Maritime AS SBP 29 Sub bottom profiler Installation Manual ...
Page 111: ...451253 A 111 Figure 12 862 216859 Drawing files ...
Page 112: ...112 451253 A Figure 13 307904 SBP 29 Installation Manual ...
Page 113: ...451253 A 113 Figure 14 862 218001 Drawing files ...
Page 114: ...114 451253 A Figure 15 871 219193 SBP 29 Installation Manual ...
Page 115: ...451253 A 115 Figure 16 871 219201 Drawing files ...
Page 116: ...116 451253 A Figure 17 388168 SBP 29 Installation Manual ...
Page 117: ...451253 A 117 Figure 18 871 219187 Drawing files ...
Page 118: ...118 451253 A Figure 19 821 219199 SBP 29 Installation Manual ...
Page 119: ...451253 A 119 Figure 20 388235 Drawing files ...
Page 120: ...120 451253 A Figure 21 871 219198 SBP 29 Installation Manual ...
Page 121: ...451253 A 121 Figure 22 388148 Drawing files ...
Page 122: ...122 451253 A Figure 23 315550 SBP 29 Installation Manual ...
Page 123: ...451253 A 123 Figure 24 430751 Drawing files ...
Page 124: ...124 451253 A Figure 25 871 212984 SBP 29 Installation Manual ...
Page 125: ...451253 A 125 Figure 26 407070 Drawing files ...
Page 126: ...126 451253 A Figure 27 448231_1A SBP 29 Installation Manual ...
Page 127: ...451253 A 127 Figure 28 427512 Drawing files ...
Page 128: ...128 451253 A Figure 29 435680 SBP 29 Installation Manual ...
Page 129: ...451253 A 129 Figure 30 444783 Drawing files ...
Page 151: ......
Page 152: ... 2019 Kongsberg Maritime ...