451253/A
131
Compass deviation requirements
SBP 29 units that are installed on the bridge may have an effect on the compass.
Once the installation is complete, the vessel must be swung with the SBP 29 in both
operative and inoperative modes.
The shipowner and captain are responsible for updating the compass deviation table
accordingly with regard to the vessel’s national registry and corresponding maritime
authority.
Noise sources
The operational performance of the SBP 29 Sub-bottom profiler depends on the noise
conditions. It is essential that the noise signature is as low as possible.
The vessel’s hull, rudder(s) and propeller(s) must be thoroughly inspected in dry dock
prior to installation.
Roughness below the water-line deformities in the shell plating and protruding obstacles
can create underwater noise. These sources of turbulence must be smoothed or removed
as best as possible.
Note
It is especially important that the propeller(s) are not pitted or damaged.
Dry docking requirements
Whenever devices for hydroacoustic use are mounted under the vessel’s hull, special
considerations must be made prior to dry docking.
Do not place supporting blocks or structures in the vicinity of the SBP 29.
The location of the SBP 29 must be noted on the vessel’s docking plan for future
reference.
Prior to dry docking, power down the SBP 29. Disengage the circuit breaker if necessary.
Label the Hydrographic Work Station and/or the circuit breaker clearly to prevent anyone
from powering up the SBP 29 accidentally.
Summary of Contents for SBP 29
Page 1: ...451253 A November 2019 Kongsberg Maritime AS SBP 29 Sub bottom profiler Installation Manual ...
Page 111: ...451253 A 111 Figure 12 862 216859 Drawing files ...
Page 112: ...112 451253 A Figure 13 307904 SBP 29 Installation Manual ...
Page 113: ...451253 A 113 Figure 14 862 218001 Drawing files ...
Page 114: ...114 451253 A Figure 15 871 219193 SBP 29 Installation Manual ...
Page 115: ...451253 A 115 Figure 16 871 219201 Drawing files ...
Page 116: ...116 451253 A Figure 17 388168 SBP 29 Installation Manual ...
Page 117: ...451253 A 117 Figure 18 871 219187 Drawing files ...
Page 118: ...118 451253 A Figure 19 821 219199 SBP 29 Installation Manual ...
Page 119: ...451253 A 119 Figure 20 388235 Drawing files ...
Page 120: ...120 451253 A Figure 21 871 219198 SBP 29 Installation Manual ...
Page 121: ...451253 A 121 Figure 22 388148 Drawing files ...
Page 122: ...122 451253 A Figure 23 315550 SBP 29 Installation Manual ...
Page 123: ...451253 A 123 Figure 24 430751 Drawing files ...
Page 124: ...124 451253 A Figure 25 871 212984 SBP 29 Installation Manual ...
Page 125: ...451253 A 125 Figure 26 407070 Drawing files ...
Page 126: ...126 451253 A Figure 27 448231_1A SBP 29 Installation Manual ...
Page 127: ...451253 A 127 Figure 28 427512 Drawing files ...
Page 128: ...128 451253 A Figure 29 435680 SBP 29 Installation Manual ...
Page 129: ...451253 A 129 Figure 30 444783 Drawing files ...
Page 151: ......
Page 152: ... 2019 Kongsberg Maritime ...