144
451253/A
7
Observe the handling rules for transducers.
Specifications for storage after unpacking
The unit must whenever possible be stored in its original transportation crate until ready
for installation.
General specifications
During storage, each box must not be used for any purpose for which it was not intended
(work platform, table, steps etc.).
Once unpacked, all equipment must be kept in a dry, non condensing atmosphere, free
from corrosive agents and isolated from sources of vibration.
Note
Do not break the seal to open a circuit board package before the board is to be used.
If the board package is returned to Kongsberg Maritime with the seal broken, we will
assumed that the unit has been used, and then you will be billed accordingly.
Each unit must be installed in its intended operating position as soon as possible
after unpacking. If the unit contains normal batteries, these may have been
disconnected/isolated before the unit was packed. These must then be reconnected
during the installation procedure. Units containing batteries are marked.
Caution
Units containing lithium or alkaline batteries must be handled separately and with care.
Such units are marked accordingly. Do not attempt to recharge such batteries, open
them, or dispose of them by incineration.
Refer to the applicable product data sheets or battery handling procedures for further
details.
Temperature protection
Any units that requires protection against extreme temperatures are identified as such
in the applicable documentation. The box used to transport and store such units are
clearly marked, for example:
Must not be transported or stored in temperatures below -5 °C.
Other temperature limits may be used if applicable.
If a unit needs temperature protection, the box to be used for storage and transportation
must be lined on all walls, base and lid, using minimum 5 cm thick polyurethane or
polystyrene foam.
Most system units can normally be stored in temperatures between -30° C and +70° C.
Refer to the relevant technical specifications for details.
SBP 29 Installation Manual
Summary of Contents for SBP 29
Page 1: ...451253 A November 2019 Kongsberg Maritime AS SBP 29 Sub bottom profiler Installation Manual ...
Page 111: ...451253 A 111 Figure 12 862 216859 Drawing files ...
Page 112: ...112 451253 A Figure 13 307904 SBP 29 Installation Manual ...
Page 113: ...451253 A 113 Figure 14 862 218001 Drawing files ...
Page 114: ...114 451253 A Figure 15 871 219193 SBP 29 Installation Manual ...
Page 115: ...451253 A 115 Figure 16 871 219201 Drawing files ...
Page 116: ...116 451253 A Figure 17 388168 SBP 29 Installation Manual ...
Page 117: ...451253 A 117 Figure 18 871 219187 Drawing files ...
Page 118: ...118 451253 A Figure 19 821 219199 SBP 29 Installation Manual ...
Page 119: ...451253 A 119 Figure 20 388235 Drawing files ...
Page 120: ...120 451253 A Figure 21 871 219198 SBP 29 Installation Manual ...
Page 121: ...451253 A 121 Figure 22 388148 Drawing files ...
Page 122: ...122 451253 A Figure 23 315550 SBP 29 Installation Manual ...
Page 123: ...451253 A 123 Figure 24 430751 Drawing files ...
Page 124: ...124 451253 A Figure 25 871 212984 SBP 29 Installation Manual ...
Page 125: ...451253 A 125 Figure 26 407070 Drawing files ...
Page 126: ...126 451253 A Figure 27 448231_1A SBP 29 Installation Manual ...
Page 127: ...451253 A 127 Figure 28 427512 Drawing files ...
Page 128: ...128 451253 A Figure 29 435680 SBP 29 Installation Manual ...
Page 129: ...451253 A 129 Figure 30 444783 Drawing files ...
Page 151: ......
Page 152: ... 2019 Kongsberg Maritime ...