2.
Place the attachment on a horizontal place, install pin (A)
and then pin (B) in this order to the arm.
3.
Lower the attachment to the ground and stop the engine.
4.
Turn the starting switch to ON position (B).
5.
Set the lock lever to FREE position (F).
6.
Operate each control lever (work equipment, travel) and
attachment control switch fully in each direction within 15
seconds after the engine is stopped to release the internal
pressure in the hydraulic circuit.
RKA63210
RKA64020
HANDLE MACHINE READY FOR INSTALLATION OF ATTACHMENT
ATTACHMENTS AND OPTIONS
6-18
WENAM00241
Summary of Contents for PC80MR-5E0
Page 2: ......
Page 12: ...Do not repeatedly handle and lift loads VIBRATION LEVELS FOREWORD 1 10 WENAM00241...
Page 70: ...GENERAL VIEW MACHINE EQUIPMENT NAME RKA67920 GENERAL VIEW OPERATION 3 2 WENAM00241...
Page 76: ...11 Fusible link 12 Ashtray if equipped 13 Tool boxes GENERAL VIEW OPERATION 3 8 WENAM00241...
Page 343: ...SPECIFICATIONS 5 1 WENAM00241...
Page 394: ...WENAM00241...
Page 395: ...REPLACEMENT PARTS 7 1 WENAM00241...
Page 411: ......
Page 412: ......