Set the machine to the greasing posture shown on the figure,
lower the work equipment to the ground, and stop the engine.
By using a grease pump, pump in grease through the grease
fittings shown by arrows.
RKA69261
(1) Link connection pin (1 place)
(2) Arm-Link connection pin (1 place)
(3) Bucket cylinder foot pin (1 place)
(4) Boom and arm connection pin (1 place)
(5) Arm cylinder rod end pin (1 place)
(6) Arm cylinder foot pin (2 place)
(7) Boom articulation and boom cylinder rod end pin (3
place)
(8) 2-piece boom cylinder head pin (1 place)
(9) 2-piece boom cylinder foot pin (1 place)
SPECIFICATIONS
RKA69280
ATTACHMENTS AND OPTIONS
2-PIECE BOOM
6-9
WENAM00241
Summary of Contents for PC80MR-5E0
Page 2: ......
Page 12: ...Do not repeatedly handle and lift loads VIBRATION LEVELS FOREWORD 1 10 WENAM00241...
Page 70: ...GENERAL VIEW MACHINE EQUIPMENT NAME RKA67920 GENERAL VIEW OPERATION 3 2 WENAM00241...
Page 76: ...11 Fusible link 12 Ashtray if equipped 13 Tool boxes GENERAL VIEW OPERATION 3 8 WENAM00241...
Page 343: ...SPECIFICATIONS 5 1 WENAM00241...
Page 394: ...WENAM00241...
Page 395: ...REPLACEMENT PARTS 7 1 WENAM00241...
Page 411: ......
Page 412: ......