Boom operation
RAISE (h) ←→ LOWER (j)
Arm operation
IN (f) ←→ OUT (g)
Bucket operation
CURL (m) ←→ DUMP (k)
Swing operation
RIGHT (d) ←→ LEFT (e)
Travel (Lo) operation
FORWARD (n) ←→ REVERSE (p)
Boom swing operation
RIGHT (q) ←→ LEFT (r)
Blade operation
LOWER (s) ←→ RAISE (t)
RKA64020
MACHINE OPERATIONS AND CONTROLS
OPERATION
3-128
WENAM00241
Summary of Contents for PC80MR-5E0
Page 2: ......
Page 12: ...Do not repeatedly handle and lift loads VIBRATION LEVELS FOREWORD 1 10 WENAM00241...
Page 70: ...GENERAL VIEW MACHINE EQUIPMENT NAME RKA67920 GENERAL VIEW OPERATION 3 2 WENAM00241...
Page 76: ...11 Fusible link 12 Ashtray if equipped 13 Tool boxes GENERAL VIEW OPERATION 3 8 WENAM00241...
Page 343: ...SPECIFICATIONS 5 1 WENAM00241...
Page 394: ...WENAM00241...
Page 395: ...REPLACEMENT PARTS 7 1 WENAM00241...
Page 411: ......
Page 412: ......