Section 4
Operation
20412948
8-2012/Rev 04
4-2
4.2
Startup Sequence
The startup sequence varies depending on the previous stop condition, and whether the machine
is equipped with the optional pressure transducer.
Startup after Motor Stop
After a normal motor stop the safety dump valve will be closed and high pressure will be present
in the intensifier. Press the start button on the Run Screen to start the motor. The machine will
be held in low pressure for 5-60 seconds as determined by the operator, it then goes to high
pressure or remains in low pressure, depending on the previous pressure setting on the Run
Screen.
If the machine is equipped with a pressure transducer and pressure is not allowed to bleed, the
startup sequence is the same as above.
If the machine is equipped with a pressure transducer and pressure is allowed to bleed through the
orifice to below 1,000 psi (69 bar), the dump valve will open. In this case, the startup sequence is
as described below.
Startup after Emergency Stop
After an emergency stop the safety dump valve will be open and high pressure released in the
intensifier. The dump valve will close three seconds after the intensifier begins to stroke.
Pull the e-stop button out and push the reset button to activate the control display. Press the start
button on the Run Screen to start the motor. The machine will be held in low pressure for for 5-
60 seconds as determined by the operator, to allow trapped air to bleed from the high pressure
cylinders. It then goes to high pressure or remains in low pressure, depending on the previous
pressure setting on the Run Screen.
Summary of Contents for Streamline SL-V 100 Plus
Page 60: ...Section 4 Operation 20412948 8 2012 Rev 04 4 19 Figure 4 20 Language Screen ...
Page 179: ...Section 12 Parts List 20413146 8 2012 Rev 12 12 7 Figure 12 2 Intensifier Assembly ...
Page 185: ...Section 12 Parts List 20413146 8 2012 Rev 12 12 13 Figure 12 6 Hydraulic Piston Assembly ...
Page 187: ...Section 12 Parts List 20413146 8 2012 Rev 12 12 15 Figure 12 7 High Pressure Piping ...
Page 191: ...Section 12 Parts List 20413146 8 2012 Rev 12 12 19 Figure 12 9 Hydraulic Power Package ...
Page 193: ...Section 12 Parts List 20413146 8 2012 Rev 12 12 21 Figure 12 10 Motor Pump Assembly ...
Page 195: ...Section 12 Parts List 20413146 8 2012 Rev 12 12 23 Figure 12 11 Hydraulic Manifold Assembly ...
Page 197: ...Section 12 Parts List 20413146 8 2012 Rev 12 12 25 Figure 12 12 Hydraulic Hose Connections ...
Page 199: ...Section 12 Parts List 20413146 8 2012 Rev 12 12 27 Figure 12 13 Reservoir Assembly ...
Page 202: ...Section 12 Parts List 20413146 8 2012 Rev 12 12 30 Figure 12 14 Bulkhead Pipe Assembly ...
Page 203: ......
Page 205: ...Section 12 Parts List 20413146 8 2012 Rev 12 12 32 Figure 12 15 Cover Assembly ...
Page 207: ...Section 12 Parts List 20413146 8 2012 Rev 12 12 34 Figure 12 16 Electrical Assembly ...
Page 210: ...Section 12 Parts List 20413146 8 2012 Rev 12 12 37 Figure 12 17 Controls Subassembly ...
Page 211: ......
Page 217: ...Section 12 Parts List 20413146 8 2012 Rev 12 12 43 Figure 12 20 Proportional Pressure Control ...
Page 219: ...Section 12 Parts List 20413146 8 2012 Rev 12 12 45 Figure 12 21 High Pressure Transducer ...
Page 221: ...Section 12 Parts List 20413146 8 2012 Rev 12 12 47 Figure 12 22 Redundant Kit ...
Page 250: ......
Page 251: ......
Page 252: ......
Page 253: ......
Page 254: ......
Page 255: ......
Page 256: ......
Page 257: ......
Page 258: ......
Page 259: ......
Page 260: ......