
Section 9
High Pressure Water System
20412997
8-2012/Rev 12
9-38
Figure 9-30: Valve Seal Installation
11.
Place the seal positioning tool into the end of the valve body as shown above. Thread the
high pressure bushing into the valve body until light contact is made with the positioning
tool. Tighten finger-tight only. See Figure 9-30, Valve Seal Installation.
12.
Apply Pure Goop anti-seize compound to the threads on the seal installation tool. Screw
the seal installation tool into the threads of the valve body. Tighten finger-tight only. See
Figure 9-30, Valve Seal Installation.
13.
Lubricate the seal and the o-ring with FML-2 food grade grease. Insert the seal and o-
ring, with the bronze wedge ring, into the seal installation tool. Insert the o-ring end of the
seal first so the tapered end of the seal (wedge ring end) faces the actuator. The tapered
end of the seal must face the actuator. See Figure 9-30, Valve Seal Installation.
14.
Use the seal push tool to push the seal assembly into the bore of the valve body until the
seal makes light contact with the positioning tool.
15.
Remove the push tool and the installation tool from the valve body.
16.
Install the existing SST backup ring and a new brass backup ring on a new stem. The vee
groove on the SST backup ring must face toward the brass backup ring. The small OD of
the brass backup ring must face toward the seal assembly.
17.
Apply FML-2 grease to the tip of the stem and insert the stem with the backup rings into
the top of the valve body so the stem enters the ID of the seal assembly. Insert the stem
until the chamfer on the stem is seated against the SST backup ring. See Figure 9-31,
Valve Stem Placement
.
Do not
push the o-ring on the seal assembly past the inlet port on the valve body.
This will damage the seal o-ring.
Summary of Contents for Streamline SL-V 100 Plus
Page 60: ...Section 4 Operation 20412948 8 2012 Rev 04 4 19 Figure 4 20 Language Screen ...
Page 179: ...Section 12 Parts List 20413146 8 2012 Rev 12 12 7 Figure 12 2 Intensifier Assembly ...
Page 185: ...Section 12 Parts List 20413146 8 2012 Rev 12 12 13 Figure 12 6 Hydraulic Piston Assembly ...
Page 187: ...Section 12 Parts List 20413146 8 2012 Rev 12 12 15 Figure 12 7 High Pressure Piping ...
Page 191: ...Section 12 Parts List 20413146 8 2012 Rev 12 12 19 Figure 12 9 Hydraulic Power Package ...
Page 193: ...Section 12 Parts List 20413146 8 2012 Rev 12 12 21 Figure 12 10 Motor Pump Assembly ...
Page 195: ...Section 12 Parts List 20413146 8 2012 Rev 12 12 23 Figure 12 11 Hydraulic Manifold Assembly ...
Page 197: ...Section 12 Parts List 20413146 8 2012 Rev 12 12 25 Figure 12 12 Hydraulic Hose Connections ...
Page 199: ...Section 12 Parts List 20413146 8 2012 Rev 12 12 27 Figure 12 13 Reservoir Assembly ...
Page 202: ...Section 12 Parts List 20413146 8 2012 Rev 12 12 30 Figure 12 14 Bulkhead Pipe Assembly ...
Page 203: ......
Page 205: ...Section 12 Parts List 20413146 8 2012 Rev 12 12 32 Figure 12 15 Cover Assembly ...
Page 207: ...Section 12 Parts List 20413146 8 2012 Rev 12 12 34 Figure 12 16 Electrical Assembly ...
Page 210: ...Section 12 Parts List 20413146 8 2012 Rev 12 12 37 Figure 12 17 Controls Subassembly ...
Page 211: ......
Page 217: ...Section 12 Parts List 20413146 8 2012 Rev 12 12 43 Figure 12 20 Proportional Pressure Control ...
Page 219: ...Section 12 Parts List 20413146 8 2012 Rev 12 12 45 Figure 12 21 High Pressure Transducer ...
Page 221: ...Section 12 Parts List 20413146 8 2012 Rev 12 12 47 Figure 12 22 Redundant Kit ...
Page 250: ......
Page 251: ......
Page 252: ......
Page 253: ......
Page 254: ......
Page 255: ......
Page 256: ......
Page 257: ......
Page 258: ......
Page 259: ......
Page 260: ......