Keysight N5290/1A Installation Guide 3-17
System Installation
PNA, Controller, and Test Head Module Interconnections
Rear Panel Cabling
shows how to install the
cables for 2-port and 4-port systems. Torque all RF connections to 8 in-lbs
(0.90 N.m) to insure proper connection.
Figure 3-12
Connect the system cables to the rear panel (8120-2970, x5, N5240-60092,
and N4011-21002 and N5292-20009)