background image

3- 18                                                                                        Keysight N5290/1A Installation Guide

System Installation
PNA, Controller, and Test Head Module Interconnections

3-

Figure 3-13 

N5290A 2- and 4-Port Model Rear Panel Cabling

Table 3-14 

N5290A 2- and 4-Port Rear Panel Cabling

From: PNA

LO OUT

D/R2

C/R1

R

TEST SET I/O

B

A

To: N5292A

LO IN

D

C

R

TEST SET I/O

B

A

Summary of Contents for N5290A

Page 1: ...etwork Analyzer System 900 Hz 110 GHz 900 Hz 120 GHz Use this manual in conjunction with the following documents PNA Series Network Analyzer Embedded Help System Online at http na support keysight com pna PNA Series Network Analyzer Installation and Quick Start Guide Part Number E8356 90001 ...

Page 2: ...o U S government customers under its standard commercial license which is embodied in its End User License Agreement EULA a copy of which can be found at http www keysight com find sweula The license set forth in the EULA represents the exclusive authority by which the U S government may use modify distribute or disclose the Software The EULA and the license set forth therein does not require or p...

Page 3: ...ngs 1 12 Environmental Requirements 1 13 System Heating and Cooling 1 13 Required Conditions for Accuracy Enhanced Measurement 1 14 Space Requirements 1 15 N5290 1A System Weight and Dimensions 1 15 Component Weight and Dimensions 1 15 Site Preparation 1 17 Power Requirements 1 17 2 System Description Information in This Chapter 2 1 Chapter Two at a Glance 2 1 N5290 1A Network Analyzer Millimeter ...

Page 4: ...repared 3 2 Tools Required for the Installation 3 2 About Installing the System 3 2 Getting Assistance from Keysight 3 3 Contacting Keysight 3 3 Receiving the System 3 4 Receiving the System 3 4 Keysight Technologies Customer Engineering 3 4 Review the Principles of Connector Care 3 5 PNA Controller and Test Head Module Interconnections 3 6 System Setup 3 6 Mounting a Network Analyzer on the Test ...

Page 5: ... 4 7 Measurement Traceability 4 8 Performing System Verification 4 10 Equipment Used in the System Verification Procedure 4 10 Cable Substitution 4 10 Kit Substitution 4 11 System Verification Procedure 4 11 If the System Fails the Verification Test 4 12 Interpreting the Verification Results 4 13 If the System Verification Fails 4 16 5 Maintenance and Support Information in This Chapter 4 1 Chapte...

Page 6: ...6 Keysight N5290 91A Installation Guide ...

Page 7: ...twork analyzer Electrostatic Discharge Protection on page 7 A discussion of electrostatic discharge ESD and related recommendations and requirements for ESD protection Also includes a table of ESD equipment part numbers Regulatory Information on page 9 Definitions of instrument markings Instructions for disposing of the analyzer s lithium battery N5292A Test Set Equipment Ratings on page 12 Descri...

Page 8: ...ard It calls attention to a procedure that if not correctly performed or adhered to could result in damage to or destruction of the instrument Do not proceed beyond a caution note until the indicated conditions are fully understood and met Warning denotes a hazard It calls attention to a procedure which if not correctly performed or adhered to could result in injury or loss of life Do not proceed ...

Page 9: ...re adequate grounding by not using this cord may cause product damage This product has been designed and tested in accordance with accepted industry standards and has been supplied in a safe condition The documentation contains information and warnings that must be followed by the user to ensure safe operation and to maintain the product in a safe condition If this product is not used as specified...

Page 10: ...the nominal supply voltage Do not operate the analyzer with the outer cover removed for more than 30 minutes as this could cause the analyzer to overheat which could result in costly damage Ventilation Requirements When installing the product in a cabinet the convection into and out of the product must not be restricted The ambient temperature outside the cabinet must be less than the maximum oper...

Page 11: ... so that the detachable power cord is readily identifiable and is easily reached by the operator The detachable power cord is the instrument disconnecting device It disconnects the mains circuits from the mains supply before other parts of the instrument The front panel switch is only a standby switch and is not a LINE switch Alternatively an externally installed switch or circuit breaker which is...

Page 12: ...1 6 Keysight N5290 1A Service Guide Safety and Regulatory Information General Safety Considerations 1 Figure 1 1 Example of a Calibration Sticker on a PNA ...

Page 13: ...n handling components and assemblies or when making connections always wear a heel strap when working in an area with a conductive floor If you are uncertain about the conductivity of your floor wear a heel strap always ground yourself before you clean inspect or make a connection to a static sensitive device or test port You can for example grasp the grounded outer shell of the test port or cable...

Page 14: ...Figure 1 2 ESD Protection Setup ESDEquipment Requiredfor the Installation Description Keysight Part Number ESD grounding wrist strap 9300 1367 5 ft grounding cord for wrist strap 9300 0980 2 x 4 ft conductive table mat and 15 ft grounding wire 9300 0797 ESD heel strap for use with conductive floors 9300 1308 ...

Page 15: ...uipment are required to be separated from normal waste for disposal Reference WEEE Directive 2002 96 EC This symbol indicates that the power line switch is ON This symbol indicates that the power line switch is in the STANDBY position This symbol indicates that the power line switch is in the OFF position This symbol is used to identify a terminal which is internally connected to the product frame...

Page 16: ...R Pub 11 Group 1 Class A AS NZS CISPR 11 ICES NMB 001 This ISM device complies with Canadian ICES 001 Cet appareil ISM est conforme a la norme NMB 001 du Canada The RCM mark is a registered trademark of the Australian Communications and Media Authority Indicates the time period during which no hazardous or toxic substance elements are expected to leak or deteriorate during normal use Forty years i...

Page 17: ... business environment Safety Complies with the essential requirements of the European Low Voltage Directive as well as current editions of the following standards dates and editions are cited in the Declaration of Conformity IEC EN 61010 1 Canada CSA C22 2 No 61010 1 USA UL std no 61010 1 Acoustic Statement European Machinery Directive To find a current Declaration of Conformity for a specific Key...

Page 18: ...latory Information N5292A Test Set Equipment Ratings 1 N5292ATest Set Equipment Ratings Table 1 1 N5292A Equipment Ratings Nominal voltage and or range 100 120 or 220 240 VAC Nominal frequency and or range 50 60 Hz Power in watts VA or current 210 W MAX ...

Page 19: ...t must be less than the maximum operating temperature of the instrument by 4 C for every 100 watts dissipated in the cabinet If the total power dissipated in the cabinet is greater than 800 watts then forced convection must be used Table 1 2 N5290 1A Environmental Conditions Operating Environment Temperature Operation 5 C to 40 C 41 F to 104 F Storage 40 C to 65 C 40 F to 158 F Measurement Calibra...

Page 20: ...y Information Environmental Requirements 1 RequiredConditions for AccuracyEnhancedMeasurement Accuracy enhanced error corrected measurements require the ambient temperature of the N5290 1A to be maintained within 1 C of the ambient temperature at calibration ...

Page 21: ... strength N5290 1ASystemWeight andDimensions Component Weight andDimensions Table 1 4 shows the maximum weight and dimensions of the N5290 1A system components Refer also to Table 1 5 on page 16 for test head module dimensions Table 1 4 N5290 1A System Weight and Dimensions Model Weight Required Benchtop Dimensions for the System Clearance Width Depth 2 Port 60 1 kg 132 lb 48 cm 19 in 178 cm 70 in...

Page 22: ...4 Port PNA X Option 425 37 kg 82 lb nominal 27 91 cm 11 0 in 48 29 cm 19 0 in 57 8 cm 22 7 in N5242B 4 Port PNA X Option 425 with Option 029 38 kg 84 lb nominal 27 91 cm 11 0 in 48 29 cm 19 0 in 57 8 cm 22 7 in N5247B 4 Port PNA X Option 425 49 kg 108 lb nominal 27 91 cm 11 0 in 48 29 cm 19 0 in 64 96 cm 25 6 in N5292A millimeter head controller Option 200 or Option 400 9 kg 20 lbs 8 83 cm 3 47 in...

Page 23: ...s supply before other parts of the instrument The front panel switch is only a standby switch and is not a LINE switch Power Requirements Before installing the system be sure that the required ac power is available at all necessary locations Three wire power cables which provide a safety ground must be used with all instruments Air conditioning equipment or other motor operated equipment should no...

Page 24: ... hour N5222 27 42 47B 350 1195 N5292A millimeter head controller 210 717 N5293A millimeter head x2 powered from controller powered from controller N5295A millimeter head x2 powered from controller powered from controller Total N5222 27 42 47B 560 1912 Values are based on 120 Vac supplied to each instrument at 60 Hz The N5292A millimeter head controller supplies power to the test head modules ...

Page 25: ... s Chapter Twoat a Glance Section Title Summary of Content N5290 1A Network Analyzer Millimeter wave System on page 2 Overview of the N5290 1A System N5292A Test Controller Description on page 16 N5292A test set controller description of front and rear panel features Compatible Millimeter Wave Modules on page 19 N5293 5A millimeter heads description of the module s features Basic System Measuremen...

Page 26: ...ame 1 0 mm test port connections throughout its entire range of test frequencies It is never necessary to make and break connections to complete a test The illustration below shows the N5290A configured for coaxial measurement The system can also be configured for on wafer measurement using a wafer probe test station Optional individual N5290A302 Extender Desktop Positioners for each millimeter he...

Page 27: ...0 1A Network Analyzer Millimeter wave System Figure 2 1 N5290A 2 Port Test System Coaxial Measurement Configuration N5291A is similar 48 Cables 1 2 m N5292A Millimeter Head Controller N5222B with Option 205 shown N5227B and N5242 7B Optional N5293A millimeter heads ...

Page 28: ...2 4 Keysight N5290 1A Installation Guide System Description N5290 1A Network Analyzer Millimeter wave System 2 Figure 2 2 N5290A System Options ...

Page 29: ...ese components are assembled into a system at the customer s site This section of the document focuses on receiving the controller with accessories and then on system installation and operation Table 2 1 on page 2 7 and Table 2 2 on page 2 7 list compatible PNA and PNA X models with required options Table 2 3 on page 2 8 and Table 2 4 on page 2 9 list available millimeter wave modules Typical syst...

Page 30: ... Configuration N5290 1A Option 201 2 Figure 2 5 4 Port Banded Millimeter wave Configuration N5290 1A Option 401 2 3 Network Analyzer Requirements The required options for PNA models are indicated in the PNA Option s column of Table 2 1 on page 2 7 The required options for PNA X models are indicated in the PNA Option s column of Table 2 2 on page 2 7 The minimum firmware revision for PNA and PNA X ...

Page 31: ...ents refer to Table 2 3 on page 2 8 through Table 2 6 on page 2 11 Inspect the shipping container If the container or packing material is damaged it should be kept until the contents of the shipment have been checked mechanically and electrically If there is physical damage refer to Contacting Keysight on page 4 4 Keep the damaged shipping materials if any for inspection by the carrier and an Keys...

Page 32: ...n 402 Option 403 N5222B 2 Port PNA Option 205 1 N5227B 2 Port PNA Option 205 1 N5242B 4 Port PNA X Option 425 1 N5242B 4 Port PNA X Option 425 with Option 029 1 N5247B 4 Port PNA X Option 425 with Option 029 1 N5293AX03 mmW Modules 2 2 4 4 4 N5292A Option 200 1 1 N5292A Option 400 1 1 1 Interconnect Kits 1 Depends on the N5290A System Option ordered with your N5290A System Refer to Table 2 7 on pa...

Page 33: ...02 Option 403 N5222B 2 Port PNA Option 205 1 N5227B 2 Port PNA Option 205 1 N5242B 4 Port PNA X Option 425 1 N5242B 4 Port PNA X Option 425 with Option 029 1 N5247B 4 Port PNA X Option 425 with Option 029 1 N5295AX03 mmW Modules 2 2 4 4 4 N5292A Option 200 1 1 N5292A Option 400 1 1 1 Interconnect Kits 1 Depends on the Interconnect kit Option ordered with your N5291A System Refer to Table 2 5 on pa...

Page 34: ...to use two wrenches when connecting the semirigid cables to the 1 2 3 4 port 1 85 mm outputs front ports of the PNA to avoid stressing the connectors and causing damage to your PNA i e the 2 4 mm cable end is compatible with the 1 85 mm connector of the PNA Table 2 5 N5290 1A PNA Millimeter Wave System Options and Interconnect Kit Part Numbers N5290 1A System Options Interconnect Kit Part Numbers ...

Page 35: ... m 12 in long 5 8121 2970 External cable assy 25 way D sub 1 N4011 21002 Upper lock foot right long 1 N5240 20093 Upper lock foot left long 1 N5240 20094 Cable assy RF SMA to SMA 16 in long 26 5 GHz 1 N5240 60092 Cable assy RF RF Source to Test Set 2 N5292 20006 Cable assy RF 2 Port LFE Source to Test Set 2 N5292 20009 Lower lock foot right 1 N5292 20012 Lower lock foot left 1 N5292 20013 N5292 60...

Page 36: ...10 0118 Cable assy coaxial 50 ohm SMA m to 50 ohm SMA m 12 in long 5 8121 2970 External cable assy 25 way D sub 1 N4011 21002 Upper lock foot right long 1 N5240 20093 Upper lock foot left long 1 N5240 20094 Cable assy RF SMA to SMA 16 in long 26 5 GHz 1 N5240 60092 Cable assy RF RF Source to Test Set 2 N5292 20006 Cable assy RF 4 port LFE Source to Test Set A 2 N5292 20007 Lower lock foot right 1 ...

Page 37: ...tion Guides to the Critical Connector Care document 1 N5292 90003 Chinese RoHS addendum for hardware 1 9320 6724 Machine screw M4 x 25 mm pan head to attach locking feet 4 0515 1619 3 dB pad attached to network analyzer CPLR THRU 4 1810 0118 Cable assy coaxial 50 ohm SMA m to 50 ohm SMA m 12 in long 5 8121 2970 External cable assy 25 way D sub 1 N4011 21002 Upper lock foot right long 1 N5240 20093...

Page 38: ...y coaxial 50 ohm SMA m to 50 ohm SMA m 12 in long 5 8121 2970 External cable assy 25 way D sub 1 N4011 21002 Upper lock foot right short 1 N5240 20092 Upper lock foot left short 1 N5240 20095 Cable assy RF SMA to SMA 16 in long 26 5 GHz 1 N5240 60092 Lower lock foot right 1 N5292 20012 Lower lock foot left 1 N5292 20013 Cable assy RF RF Source to Test Set SMA 2 4 mm 4 N5292 20014 Cable assy RF 4 P...

Page 39: ...ble soon Refer to Contacting Keysight on page 4 4 Table 2 7 Rackmount Front Handle Kits Keysight Part Number Description Qty 5063 1543 Rackmount Kits for installation without handles PNA 1 5063 1555 Rackmount Kits for installation with handles PNA 1 N5290 1A system rackmount kits are going to be available soon Refer to Contacting Keysight on page 4 4 Table 2 8 N5290A and N5291A Millimeter System O...

Page 40: ... a full S Parameter test set The millimeter head controller supplies RF and LO signals to the millimeter wave test head modules and returns the down converted reference and test IF signals to the PNA for processing and display The N5292A 200 and N5292A 400 millimeter head controllers also supply the 12 volt bias to each millimeter wave head module The front panels of the N5292A Option 200 and N529...

Page 41: ...d from the millimeter wave modules Source In Receives amplified RF signal to the millimeter wave module s RF Input Connects from the PNA s SOURCE OUT to the corresponding N5292A Source In This enables each port to have independent RF port power levels on all to 4 ports if available Low Band Receives an amplified LFE signal 900 Hz to 100 MHz from the PNA s 1 2 3 4 ports that is combined with the ma...

Page 42: ...nd amplified and then output to the front panel of the N5292A Option 200 400 Test Set I O The test set interface connector is used digitally control to the test set from the analyzer Line Module This assembly houses the line cord connection Line voltage selection is automatic and no setting is required Power Cords A line power cord is supplied in one of several configurations depending on the dest...

Page 43: ...imeter wave module is usually the primary module of a millimeter wave VNA system A single Transmission Reflection module allows the measurement of S11 reflection coefficient only Refer to Figure 2 9 on page 19 The use of two Transmission Reflection modules in the millimeter wave VNA system allows for all four S parameters to be measured The test downconverters of Transmission Reflection modules ar...

Page 44: ...tions between the N5293 5A test head modules the N5292A Option 200 or N5292A Option 400 millimeter head controller and the N5222 7B PNA or N5242 7B PNA X This section describes some of the features of the N5293 5A millimeter Wave modules Active LED When the millimeter wave mmW module is connected and addressed by a N5292A Test Set Controller the LED is On blue The LED is green when the mmW module ...

Page 45: ...2 10 N5293 5A Left and Right Frequency Extender Test Head Modules Front View Figure 2 11 N5293 5A Left and Right Frequency Extender Test Head Modules Back View Integrated N5292A Controller Front Port Connector 20 dBm 50 VDC 1 mm LED Sense Bias 50V 1A BNC Integrated N5292A Controller Front Port Connector ...

Page 46: ...ctors to Port 1 left test head module directly and to Port 2 right test head module by way of a female to female test cable It is also possible to connect the DUT using a test port cable on each test port although this configuration will result in greater signal loss i e Devices with female connectors can connect directly to the test ports Devices with male connectors require a female to female ca...

Page 47: ...ription Basic System Measurement Configurations Figure 2 12 N5290 1A 4 Port Test System Coaxial Measurement Configuration N5291A is similar 48 Cables 1 2 m N5292A Millimeter Head Controller N5247B shown N5222 7B and N5242B Optional N5293A millimeter heads ...

Page 48: ...2 24 Keysight N5290 1A Installation Guide System Description Basic System Measurement Configurations 2 ...

Page 49: ...on Title Summary of Content Getting Prepared on page 2 Discusses how to download the service guide tools required for installation and the time required to install the system Getting Assistance from Keysight on page 3 How to contact Keysight for support with your system Receiving the System on page 4 What to do when you receive your system verifying the parts received and customer engineering supp...

Page 50: ...ng cable connections especially wire harness connections The person performing the work accepts responsibility for the full cost of the repair or replacement of damaged components Description Qty Part Number T 10 TORX driver set to 9 in lbs 1 N A T 20 TORX driver set to 21 in lbs 1 N A 5 16 in torque wrench set to 8 in lbs 1 N A 5 16 in torque wrench set to 10 in lbs 1 N A 5 16 in torque wrench se...

Page 51: ... fromKeysight Installing this upgrade kit requires special skills and experience Keysight will provide a customer engineer to assist you with the system s installation Refer to Keysight Technologies Customer Engineering on page 3 4 Contacting Keysight Refer to Keysight Support Services and Assistance on page 4 4 ...

Page 52: ...ght Support Services and Assistance on page 4 4 Keysight Technologies Customer Engineering A Keysight Technologies Customer Engineer will be assigned to help you install the system During installation the Customer Engineer will do the following Unpack the system components Verify the system parts list see Table 2 3 on page 2 8 or Table 2 4 on page 2 9 Initialize the PNA as described in E8356 90001...

Page 53: ...nd connection techniques are critical for accurate and repeatable measurements Refer to Table 5 1 on page 5 3 for tips on connector care Prior to making connections to your analyzer carefully review the information about inspecting cleaning and gaging connectors Refer to the calibration kit documentation for detailed connector care information ...

Page 54: ...ontroller But other PNAs are similar Interconnect kits includes the SMA 50 ohm loads cables upper and lower locking feet and screws Refer to Table 2 6 on page 2 11 IMPORTANT The N5227B and N5247B interconnect kits contain 2 4 mm to 3 5 mm cables It is important to connect the 2 4 mm end to the PNA and to connect the 3 5 mm end to the N5292A test set controller Improper connections will result in d...

Page 55: ...e rear panel on the test set Figure 3 1 Rear Bottom Feet 4 Install the two rear locking feet N5240 20092 and N5240 20095 or N5240 20093 and N5240 20094 onto the analyzer where the standoffs were removed using 0515 1619 screws Use T 20 to torque to 21 in lbs Optional Rotate the PNA 180 degrees to install locking feet Refer to Figure 3 2 on page 8 The network analyzer is heavy It is recommended that...

Page 56: ... Figure 3 2 Install upper locking feet N5240 20092 and N5240 20095 using 0515 1619 screws N5292 20092 and N5292 20095 are shorter in length and used on the N5227 47B i e N5240 20093 and N5240 20094 are similar but longer in length and used on the N522B 42B Locking foot short N5240 20092 Locking foot long N5240 20095 ...

Page 57: ...n page 9 Figure 3 3 Install lower lock feet N5292 20012 and N5292 20013 using screws 0515 1619 6 Mount the analyzer on top of the test set and ensure that the front frame of the analyzer is positioned slightly forward of the locks that are attached to the test set Slide the analyzer back so the locks engage the front frame of the analyzer Refer to Figure 3 4 and to Figure 3 5 on page 10 Figure 3 4...

Page 58: ...3 using the spring loaded screws on the locking feet Refer to Figure 3 5 If the locking feet are not aligned with the screw holes in the test set s upper locking feet loosen the screws securing the feet to the instrument slightly to align and tighten Figure 3 5 Install N5292A test set controller to the bottom of the PNA using vertical links and upper foot locks N5292 20012 and N5292 20013 Long foo...

Page 59: ... and Test Head Module Interconnections 8 Remove semirigid cables from SOURCE OUT to CPLR THRU Refer to Figure 3 6 9 Connect 50 ohm terminations to CPLR THRU ports 1810 0818 Refer to Figure 3 6 Figure 3 6 Remove Semirigid Cables and Connect 50 termination to the CPLR THRU Ports ...

Page 60: ...2 4 mm to 3 5 mm cables It is important to connect the 2 4 mm end to the PNA and to connect the 3 5 mm end to the N5292A test set controller Improper connections will result in damage to your instruments It is important to use two wrenches when connecting the semirigid cables to the 1 2 3 4 port 1 85 mm outputs front ports of the PNA to avoid stressing the connectors and causing damage to your PNA...

Page 61: ...ad Module Interconnections N5290 1A Option 201 Interconnect Kit N5292 60012 Refer to Figure 3 8 Figure 3 8 N5290 1A 201 Interconnect Kit N5292 60012 Install semirigid cables N5292 20006 and N5292 20009 and if not done connect 50 ohm loads 1810 0118 to the front panel of the PNA and N5292A ...

Page 62: ...he PNA and N5292A IMPORTANT The N5227B and N5247B interconnect kits contain 2 4 mm to 3 5 mm cables It is important to connect the 2 4 mm end to the PNA and to connect the 3 5 mm end to the N5292A test set controller Improper connections will result in damage to your instruments It is important to use two wrenches when connecting the semirigid cables to the 1 2 3 4 port 1 85 mm outputs front ports...

Page 63: ...connections N5290 1A Option 401 or N5290 1A Option 402 Interconnect Kit N5292 60016 Figure 3 10 is used for a N5292 60016 interconnect kit Figure 3 10 N5290 1A 401 or N5290 1A 402 Install semirigid cables N5292 20006 N5292 20007 and N5292 20008 to the front panel of the PNA and N5292A Option 442 is shown ...

Page 64: ... PNA and N5292A IMPORTANT The N5227B and N5247B interconnect kits contain 2 4 mm to 3 5 mm cables It is important to connect the 2 4 mm end to the PNA and to connect the 3 5 mm end to the N5292A test set controller Improper connections will result in damage to your instruments It is important to use two wrenches when connecting the semirigid cables to the 1 2 3 4 port 1 85 mm outputs front ports o...

Page 65: ...ear Panel Cabling Figure 3 12 on page 17 and Figure 3 13 on page 18 shows how to install the cables for 2 port and 4 port systems Torque all RF connections to 8 in lbs 0 90 N m to insure proper connection Figure 3 12 Connect the system cables to the rear panel 8120 2970 x5 N5240 60092 and N4011 21002 and N5292 20009 ...

Page 66: ...allation PNA Controller and Test Head Module Interconnections 3 Figure 3 13 N5290A 2 and 4 Port Model Rear Panel Cabling Table 3 14 N5290A 2 and 4 Port Rear Panel Cabling From PNA LO OUT D R2 C R1 R TEST SET I O B A To N5292A LO IN D C R TEST SET I O B A ...

Page 67: ...IMPORTANT In order to maintain compliance to the certificate of calibration it is recommended that the frequency extenders be connected to the corresponding test set ports per the Certificate of Calibration provided IMPORTANT Before connecting the millimeter wave modules verify that the test set and the power supplies if used are powered down The N5292A test set controller s integrated front panel...

Page 68: ...and Test Head Module Interconnections 3 N5292A Option 200 2 Port Cable Connections Figure 3 15 Cable Connections for Two Test Heads Module Figure 3 16 Cable Two Test Heads N5293 5AX03 to the N5292A Attach heads and torque cable screws to 8 in lbs Torque cable screws to 8 in lbs ...

Page 69: ...stallation PNA Controller and Test Head Module Interconnections N5292AOption400 4 Port Cable Connections Figure 3 17 Cable Connections for Four Test Heads Module Figure 3 18 Cable Four Test Heads N5293 5AX03 to the N5292A Torque cable screws to 8 in lbs ...

Page 70: ...mode 1 On the PNA press Setup External Hardware Millimeter Config 2 On the PNA press Instrument Setup External Hardware Millimeter Head Off to Millimeter Head On 3 Power down the PNA 4 On the N5292A test set controller verify the test set is powered down 5 Power up the PNA 6 Power up the N5292A The N5290 1A system should now initialize and recognize the mmW modules The port 1 module LED should be ...

Page 71: ...er Config 2 The Millimeter Configuration window that opens should have N5290A Broadband or N5291A Broadband highlighted Else press N5290A Broadband or N5291A Broadband Refer to Figure 3 19 Figure 3 19 Millimeter Configuration Window This installation calibration should be ran when you first install your system and whenever you make any changes to your system s configuration See also Troubleshootin...

Page 72: ...e following dialog box is displayed Remove the load and press Finish Refer to Figure 3 21 Figure 3 21 Millimeter Installation Cal Dialog Box Load Calibration Finish 5 The following dialog box is displayed until the calibration is finished i e Is is not necessary to connect a calibration kit open for this step Refer to Figure 3 22 Figure 3 22 Millimeter Installation Cal Dialog Box Open circuit Cali...

Page 73: ...Keysight N5290 1A Installation Guide 3 25 System Installation Running the Installation Calibration 6 If prompted repeat steps 3 through 5 for all of the other ports requiring calibration ...

Page 74: ... contain optical sensors to ramp power up or down gradually when the N5293 5A millimeter modules are connected and disconnected to prevent damage Refer to Figure 3 23 and Figure 3 24 Figure 3 23 Millimeter configuration warning when a module is disconnected or not connected properly port 1 is shown Figure 3 24 Millimeter configuration warning when a port s modules do not match the factory s calibr...

Page 75: ...ks on page 4 2 Overview System Operator s Check on page 4 3 Describes the System Operator s Check and what to do if Operation Check fails If the Operator s Check Fails on page 4 6 Description of what to do if Operator s Check fails System Verification on page 4 7 Describes the System Verification for validating your N5290 1A Systems Includes descriptions of printed and graphical N5290 1A system ve...

Page 76: ...ysight N5290 1A Installation Guide Performance Verification Preliminary Checks 4 Preliminary Checks Preliminary checks include the following System Operator s Check on page 4 3 System Verification on page 4 7 ...

Page 77: ...e PNA Operator s Check dialog box refer to Figure 4 1 under Configure select either Prompt for attachment of Short Open to pause at each step in the process to allow moving the short open to the appropriate port Shorts Opens are attached to ALL ports to run through the test without stopping Shorts and opens can be mixed on the test ports Additionally you can choose Pause on Failure Use unique log ...

Page 78: ...result of the operator s check will be shown as a PASS or FAIL next to each test refer to Figure 4 1 The PNA Operator s Check dialog box will look different for different PNA model numbers and installed options Some of the tests are performed only if the appropriate options are installed in the PNA ...

Page 79: ...Keysight N5290 1A Installation Guide 4 5 Performance Verification System Operator s Check Figure 4 1 Operator s Check Dialog Boxes ...

Page 80: ... Verification If the Operator s Check Fails 4 If the Operator s Check Fails 1 Clean the test ports shorts and adapters Torque to specification Repeat the check 2 If the check still fails suspect a faulty component Refer to Contacting Keysight on page 4 4 ...

Page 81: ...bedded on line help What the SystemVerificationVerifies The system verification procedure verifies proper operation of the network analyzer test set controller millimeter head modules calibration kit test port cables together as a system It DOES NOT verify that any of these components pass their specifications independently The user is responsible for independently calibrating and verifying the pr...

Page 82: ... phase of an error response is not known phase is assumed to be worst case 180 to 180 Random errors such as noise and connector repeatability are generally combined in a root sum of the squares RSS manner Measurement Traceability To establish a measurement traceability path to a national standard for a network analyzer system the overall system performance is verified through the measurement of de...

Page 83: ...Keysight N5290 1A Installation Guide 4 9 Performance Verification System Verification Figure 4 2 Traceability Path for Calibration and Verification Standard ...

Page 84: ...n storing and recalling calibrations For each verification device the analyzer reads a file from the verification media and sequentially measures the magnitude and phase for all four S parameters Equipment Used in the System Verification Procedure Cable Substitution The test port cables specified for the network analyzer system have been characterized for connector repeatability magnitude and phas...

Page 85: ... kits are not recommended nor supported System Verification Procedure 1 If you desire printed test outputs connect a printer to the analyzer For the printer ensure that the correct driver is loaded and the printer is defined as the default printer Refer to the embedded help in the analyzer for printer setup Let the analyzer warm up for at least 90 minutes 2 Insert the verification kit memory stick...

Page 86: ...n the analyzer for performing a full calibration or recalling an existing recent calibration 8 Follow the instructions on the analyzer for performing the system verification inserting the verification devices as prompted If the System Fails the Verification Test 1 Disconnect and clean the device that failed the verification test 2 Reconnect the device making sure that all connections are torqued t...

Page 87: ... Refer to Figure 4 4 for additional troubleshooting steps Figure 4 4 System Verification Failure Flowchart Interpreting the Verification Results Figure 4 5 shows an example of typical verification results with Print Tabular Data selected in the Printer Output area of the System Verification dialog box At the top of the printed output is the name of the device the serial number of the device and th...

Page 88: ...rformance Verification System Verification 4 Each S parameter measurement result is printed with frequency tested lower and upper limit lines the measured data and the result of the test Figure 4 5 Example of Printed Tabular Verification Results ...

Page 89: ...e System Verification dialog box The printed graphical results show the following the name of the device measured the serial number of the device the parameters measured Results of the measurements Data measured at the factory from the verification kit Upper and lower limit points as defined by the total system uncertainty system Figure 4 6 Example of Printed Graphical Verification Results 4 port ...

Page 90: ...16 Keysight N5290 1A Installation Guide Performance Verification If the System Verification Fails 4 If the SystemVerificationFails If the System Verification fails refer to Contacting Keysight on page 4 4 ...

Page 91: ... InformationinThis Chapter Chapter Five at a Glance Section Title Summary of Content Maintenance on page 4 2 How to take care of your system electrically and your system s connector care Keysight Support Services and Assistance on page 4 4 Discusses your system s warranty how to contact Keysight and ship an item to Keysight for repair ...

Page 92: ... the surface To remove dust simply spray the pressurized air on the waveguide surface Principles of Connector Care Proper connector care and connection techniques are critical for accurate and repeatable measurements Refer to Table 5 1 for tips on connector care Prior to making connections to your analyzer carefully review the information about inspecting cleaning and gaging connectors Refer to th...

Page 93: ...astic support beads Clean connector threads Gaging Connectors Do Clean and zero the gage before use Do Not Use an out of specification connector Use the correct gage type Use correct end of calibration block Gage all connectors before first use Making Connections Do Align connectors carefully Do Not Apply bending force to connection Make preliminary connection contact lightly Over tighten prelimin...

Page 94: ... repairs require that the defective component be returned to Keysight ContactingKeysight Assistance with test and measurements needs and information or finding a local Keysight office are available on the Web at http www keysight com find assist If you do not have access to the Internet please contact your Keysight field engineer Extended warranties are available in many geographical areas Contact...

Page 95: ...ce Guide for your PNA model number use the following steps 1 Go to www keysight com 2 In the Search box enter the model number of the analyzer Ex N5290A or N5291A and click Search 3 Click Technical Support Manuals 4 Click Service Manual 5 Click the service guide title to download the PDF file 6 When the PDF of the Service Guide is displayed scroll through the Contents section bookmarks to locate t...

Page 96: ...This information is subject to change without notice Keysight Technologies 2009 2017 Edition 1 December 2017 N5292 90002 www keysight com ...

Reviews: