3- 2 Keysight N5290/1A Installation Guide
System Installation
Getting Prepared
3-
Getting Prepared
To successfully install this N5290/1A system, you will need the following:
— An ESD-safe work area - refer to
“Electrostatic Discharge Protection” on
.
— Sufficient AC power – refer to
“Site Preparation” on page 1-17
— Correct tools for system validation - refer to
.
— Enough time - refer to
“About Installing the System” on page 3-2
Tools Required for the Installation
About Installing the System
The N5290/1A contains extremely sensitive components that can be
ruined if mishandled. Follow instructions carefully when making cable
connections, especially wire harness connections.
The person performing the work accepts responsibility for the full cost of
the repair or replacement of damaged components.
Description
Qty
Part Number
T-10 TORX driver (set to 9 in-lbs)
1
N/A
T-20 TORX driver (set to 21 in-lbs)
1
N/A
5/16-in torque wrench (set to 8 in-lbs)
1
N/A
5/16-in torque wrench (set to 10 in-lbs)
1
N/A
5/16-in torque wrench (set to 21 in-lbs)
1
N/A
14 mm open-end wrench (set to 4 in-lbs)
1
N/A
20 mm open-end wrench (set to 8 in-lbs)
1
N/A
Use a 5/16-in torque wrench set to 8 in-lbs on all semirigid front and rear
panel cable connections.
Products affected
N5290A, N5291A, N5292A, N5293A, and N5295A.
Installation to be performed by
Keysight customer engineer or personnel qualified by Keysight
Estimated installation time
4 hours
Estimated full instrument verification time 4.0 hours