22 Ejection chute
C1200
Installation of ejection chute after delivery
After delivery of the machine, mount the
servomotor of the ejection flap.
Remove the split cutter pin from the
securing bolt and mount the motor.
Feed the cable of the servomotor
through the cable duct.
Ensure that the cable is sufficiently long
so that it is not damaged or twisted when
the ejection chute is moved.
Do not
tighten
the
cable
but ensure that there
is ample play.
The ejection chute can be folded down,
e.g. in the event of a blockage. To do
this, loosen the two brackets. The
clamping force of the brackets can be
adjusted by means of the eyebolts.
When placing the ejection chute onto the
flange surfaces, ensure that they are
clean.
The ejection chute can be equipped with
a
gas-filled strut
(optional)
facilitating opening and closing of the
chute.
Summary of Contents for Champion C 1200
Page 13: ...10 Designation of assembly groups C 1200 ...
Page 15: ...12 Champion harvesting technology C 1200 ...
Page 17: ...19 Technical instructions C 1200 ...
Page 19: ...19 Technical instructions C 1200 ...
Page 29: ...30 Operating instructions C 1200 ...
Page 42: ...32 2 Blade rotor C1200 Installation position ...
Page 45: ...35 Greasing chart C 1200 ...
Page 47: ...35 Greasing chart C 1200 ...
Page 48: ...35 Greasing chart C 1200 ...
Page 51: ...38 Maintenance and inspection C 1200 ...
Page 53: ...38 Maintenance and inspection C 1200 ...