Technician's instructions KEY Laser III 1243
3 Maintenance work on KEY Laser 1243
|
3.2 Cooling system
3.2 Cooling system
Component
Jobs to be done
Exchange interval
Parts to replace as needed
Cooling system
In service mode, turn on
MP 1-0 [laser power sup‐
ply/cooling system on/off]
and check the seal. In ser‐
vice mode check the flow
sensor with MP 1-2 [dis‐
play input ports] and tem‐
perature sensor with MP
1-7 [display ADC chan‐
nels].
Flow monitor
Mat. no. 1.000. 7730
Temperature sensor
Mat. no. 1.001. 3527
Pump chamber
Exchange the O-rings of
the flash lamp
Replace the coolant water
Insert new ion exchanger.
Start cooling system. For
details, see assembly in‐
structions.
2 x O-rings ➋ flash lamps
Mat. no. 1.000. 7720
NOTE: Change the O-
rings every two years due
to strong light irradiation.
Distilled water ➋ (conduc‐
tivity < 10µS)
Ion exchanger
➊Mat. no. 1.000.7731
165/176
Summary of Contents for KEY Laser III 1243
Page 1: ...Technician s instructions KEY Laser III 1243 Always be on the safe side ...
Page 179: ......
Page 180: ...1 001 1738 kb 20080314 04 en ...