Kaleidescape Part No. 101-0105-00 Rev 5
Page 26
Kaleidescape Premiere Line Installation Guide
Physical Installation
Figure 3-1
Minimum Clearance Requirements
Power Requirements
Component power supplies in the Premiere line are universal input and
operate on any nominal line voltage between 100–240 V, 50–60 Hz. Verify
that power outlets are grounded, preferably shielded from power surges and
brownouts.
Kaleidescape recommends a grounded outlet with a high-quality surge
protector for the power source for players, disc vaults and servers. A UPS is
optional for servers.
lists power requirements for each
component.
1 in. (2.5 cm)
minimum
clearance on
front and sides
2 in. (5 cm)
minimum
clearance
in back
Cool air intake
Hot air exhausted
outside the
component enclosure