• For service personnel to remove and install hardware components, allow at least 24 in. (60.9 cm) on
top of the router. See
Figure 25: ACX500 Outdoor Router with PoE Chassis Dimensions and Clearance Requirements—Front
View
86
• For service personnel to remove and install hardware components, allow at least 24 in. (60.9 cm) on
top of the router. See
Figure 25: ACX500 Outdoor Router with PoE Chassis Dimensions and Clearance Requirements—Front
View
86