– 90 –
d
d
d
EPD
EPD
Data edit screen
1) Press key
for three seconds.
Communication screen 1
2) Press key
.
3) Press key
.
(2) Setup of operation panel
When the case is as below, it is necessary to perform re-setup of the program of the operation panel.
o When the operation panel is used as that for other model.
o When version-up of the program is performed.
The way of performing setup of the program from the smart media is shown below. Besides, it is regarded that
the program to perform setup has already entered the smart media card.
1)
First, turn ON the power. Normally, the sewing ready screen is displayed.
2)
Insert the smart media card into the operation panel.
3)
Perform operation by the procedure below.
Data selection screen
4) Press key
.
5) Press key
.
EPD
Summary of Contents for AMB-289
Page 11: ...7 MEMO...
Page 16: ...12 5 Wiper adjustment Wiper components 3 to 5mm 6 to 8mm Standard Adjustment...
Page 18: ...14 6 Adjusting the face plate thread tension A 12mm Standard Adjustment...
Page 22: ...18 8 Adjusting the position of Y top feed motor Standard Adjustment...
Page 24: ...20 9 Adjusting the position of Y bottom feed motor Standard Adjustment...
Page 26: ...22 10 Adjusting the tongue up down cylinder 19mm 5mm Gauge A Standard Adjustment...
Page 30: ...26 12 Adjusting the differential feed X top feed motor 6 0 5mm Align Standard Adjustment...
Page 36: ...32 15 Adjusting the chuck open close cylinder Standard Adjustment 26 0 5mm...
Page 42: ...38 16 Adjusting the respective sensors 3 3 C Standard Adjustment 14 5 0 5mm...
Page 48: ...44 2 Disassembling and assembling of the face plate Procedures of disassembling assembling...
Page 62: ...58 8 Replacing the thread trimmer cylinder 4 5mm Procedures of disassembling assembling...
Page 68: ...64 11 Replacing the thread drawing motor A B C C Procedures of disassembling assembling...
Page 70: ...66 12 Replacing the loader motor Procedures of disassembling assembling...
Page 81: ...77 MEMO...
Page 172: ...168 MEMO...
Page 176: ...172 MEMO...