Intel
®
Server System R1000WF Product Family System Integration and Service Guide
65
3.
Place the two side wall foam inserts.
4.
Place three corrugated double wall cardboard pads on top of the two bottom foam inserts as shown.
5.
Carefully place the system into the shipping bag and tape the bag shut.
6.
Carefully lower the system into the inner shipping box as shown.