Chapter 11 Maintenance
10.2 After cleaning
NOTE
Note the optimum assembly sequence.
1. Attach the pump unit (rotor/stator/pressure gauge) to
the mixing pipe by means of both tie rods.
2. Open the eccentric lock and move the motor away to
the side. Push the mixing coil into the material hopper.
Then move the motor back again and close the eccen-
tric lock. Ensure that the mixing coil is connected to the
motor via the motor bracket.
3. In case you are using a compressor, connect the yellow air
hose to the mixing pump and plug the power cable into the
upper right socket on the switching cabinet.
4. In case you are using a booster pump, plug the power
cable into the upper left socket on the switching cab-
inet.
5. Connect the input socket to the external power supply
(230 V / 16 Hz)
10.3 Decommissioning
Running the machine until it is empty and switching
it off
1. Stop filling with bagged goods in sufficient time.
2. Run the material hopper, mixing pipe and pump unit
(rotor/stator/pressure gauge) until they are empty.
3. Clean the machine.
4. Switch off the mixing pump. To do this, turn the main
switch to the vertical position “0”.
5. Pull out the mains plug.
6. Interrupt the external water supply by closing the water
valve.
7. In order to release the pressure (approx. 2.5 bar), open
the water drainage valve on the water measuring sys-
tem under the pressure reducer.
8. Dismantle the pump unit and mixing coil.
11 Maintenance
Have the machine inspected once a year by a specialist work-
shop. Replace parts which are subject to wear as soon as the
wear limits have been reached. Portable machines, like the
inoCOMB Picco Power, must be subject to an annual elec-
trical inspection according to the implementing regulation
for electrical plant and operating resources (DGUV V3). This
inspection may only be carried out by a qualified electrician
(e.g. electrical engineer, electrical technician, master electri-
cian, senior electrician, foreman electrician or assistant elec-
trician). Electrical specialists work at all INOTEC service cen-
tres, conducting electrical inspections in line with DGUV V3.
To arrange an inspection, call the INOTEC service hotline on
+49 7741 6805 777.
WARNING
Cleaning and maintenance work can put
the safety of operating staff at risk and impair the
functionality of the machine.
1. Stop the mixer by pressing the red rotary switch on the
main switch.
2. Pull out the mains plug.
3. Secure the machine against unexpectedly being
switched back on
4. Before cleaning with the water jet, cover all the open-
ings that water must not penetrate into for safety and
functional reasons.
5. After cleaning, remove all the covers which were at-
tached to protect against the water.
11.1 Maintenance plan
Have the machine inspected
at a specialist workshop or at
an INOTEC service centre
Once a year
(Recommended)
Electrical inspection (DGUV
V3) by a qualified electri-
cian or at an INOTEC service
centre
Once a year
(Mandatory, stipulated
by DGUV V3)
The dirt trap sieve in the
water inlet is to be cleaned/
replaced by the operator
Daily
The dirt trap sieve in the
pressure reducer is to be
cleaned/replaced by a service
technician
Monthly
Summary of Contents for inoCOMB Picco Power
Page 41: ...Page 41 EN Chapter 13 Systems 13 3 Circuit diagram for compressor...
Page 42: ...Page 42 EN Chapter 13 Systems 13 3 1 Circuit diagram for mixer motor safety switch...
Page 44: ...Page 44 EN Chapter 13 Systems 13 3 3 Circuit diagram for pump rotation speed...
Page 45: ...Page 45 EN Chapter 13 Systems 13 3 4 Switching cabinet subplate inside...
Page 46: ...Page 46 EN Chapter 13 Systems 13 3 5 Switching cabinet outside...